Edinburgh Place Ferry Pier, often referred to as the "Star Ferry" Pier, was a pier in Edinburgh Place, Central, Hong Kong, serving the Star Ferry. The pier, with its clock tower, was a prominent waterfront landmark. Built in 1957 at the height of the Modern Movement, it was the third generation of the Star Ferry Pier in Central, and was located near the City Hall and the General Post Office.

The pier was the central flashpoint of the Hong Kong riots in 1966, and 40 years later became the focus of a confrontation between conservationists and the government, which wanted to demolish the pier to allow for reclamation. The ferry service from the pier was suspended on 11 November 2006, and moved to piers 7 and 8 of Central Piers. Demolition commenced on 12 December, and was completed in early 2007.

Edinburgh Place Ferry Pier

History

The entire waterfront where the "third generation" pier was situated was created in the late 1950s following a major land reclamation. The shoreline was shifted from its position at the time, level to the Mandarin Hotel. The pier was built in 1957 in Edinburgh Place, at the height of the Modern Movement, near the City Hall complex which was being planned at the time.

Edinburgh Place Ferry Pier

The Star Ferry Pier was designed by a local Chinese architect, Hung Yip Chan (born in 1921). He worked in the Architectural Office (AO) of the Hong Kong Government from 1952 to 1957 as an assistant architect. He designed the façade of the pier, and the Chief Architect, Michael Wright, added the Clock Tower to make the pier more balanced and practical.

Edinburgh Place Ferry Pier

The chimes of the turret clock installed at the pier marked every quarter-hour since the pier's inauguration in 1957. The clock was a gift from John Keswick, who had in turn received it from the Prince of Belgium. The mechanism was manufactured by British company Edward John Dent, which also provided the mechanical signature to "Big Ben" of London.

There is a major bus terminus on the Kowloon side, which is conveniently situated close to the Tsim Sha Tsui Ferry Pier. Thousands of residents passed through this principal gateway to Hong Kong Island from the Kowloon Peninsula daily from 1957 until 2006. However, the inauguration of the Cross-Harbour Tunnel in 1972 popularised vehicular travel across the harbour and reduced the flow of passengers. From 1972 to 2006, the ferry was still used by many as the shortest route from Tsim Sha Tsui (TST) to Central District, and a daily average of 74,000 passenger trips were made across the harbour in 2004.

On the island side, various New World First Bus and Citybus bus routes as well as public light buses connected to many destinations on Hong Kong Island.

Relocation

The plan to relocate the Central Ferry Piers dates back to July 1999, when proposed amendments to the draft Central District (Extension) Outline Zoning Plan covering the Central Reclamation III area were published. Both the third generation Star Ferry Pier and Queen's Pier would be demolished and 16 hectares of land directly in front of the fourth-generation pier reclaimed to make way for a six-lane road and a low-rise shopping centre. The cost was estimated at HK$3.5 billion. The Government said that the historical significance of the third-generation pier would be recognised and promised to recreate the landmark on the new waterfront.

In 2001, an impact assessment for the Central Reclamation recommended the relocation of the Star Ferry Pier, and this was approved by the Antiquities Advisory Board in 2002.

Demolition

3D Laser Scanning Technology in digital recording of structures was applied to capture three-dimensional images of the pier before the demolition.

Following the pier's decommissioning on 12 November 2006, demolition work started amidst protests. The demolition was originally scheduled for the early part of 2007, but demolition was brought forward by 3 months, to 12 December 2006. The government ignored a nonbinding motion in September in the Legislative Council of Hong Kong urging it to retain the pier and clock tower.

The demolition crew took control of the site by erecting scaffolding on 6 December 2006, and demolition commenced on 12 December. Workers took down the clock mechanism and clock face, leaving a gaping hole, and then proceeded to lift the clock tower off in one piece. After the protesters had been dispersed, the remainder of the pier was completely dismantled, away from the glare of publicity.