These unpleasant jokes were not confined to the house; for if the unfortunate guest took refuge in the garden, and unwittingly entered the summer-house by the side of the canal, immediately he was sent out afloat to the middle of the water, and could not possibly make his escape without the intervention of the manager. These tricks were apparently played for mere amusement; but Mr. Winstanley at one time turned his mechanical contrivances to account, by establishing an exhibition at Hyde-Park Corner, called 'Winstanley's Water-Works,' the price of admission being one shilling each person.

Unimportant as these particulars may appear, they serve to mark the turn of mind of the first engineer of the Eddystone, and to account in some degree for the whimsical nature of the buildings erected by him.

Smeaton and Lighthouses — Part 15

From Winstanley's own narrative, we find that he began his lighthouse in 1696, and that it took more than four years in building, both on account of the greatness of the work, and the difficulty and danger of getting backwards and forwards to the place. Though nothing was attempted except in the summer season, yet even then, the weather at times would prove so unfavourable that for ten or fourteen days together, owing to the ground-swell from the main ocean, the sea would be raging about these rocks, while calm elsewhere, and fly up more than two hundred feet, burying all the works, and making it impossible for the engineer to approach.

Smeaton and Lighthouses — Part 15

The first summer was spent in making twelve holes in the rock, and fastening twelve large irons to hold the work that was to be done afterwards. It appears that Winstanley and his party made single journies every time from Plymouth, and had not any store-ship lying at moorings as a place of constant retreat. This was a great oversight, and unnecessarily retarded his work. Many journies were taken in vain, when no landing could be effected, and during the work the hours of labour were needlessly curtailed by preparations for the safety of the materials during their absence, and also for their own departure.

Smeaton and Lighthouses — Part 15

The second summer was employed in making a solid round pillar, twelve feet high and fourteen in diameter. This was an important step: the workmen had now some small shelter, and something to hold by. The season also proved rather more favourable than the preceding; but the labour of conveying materials, and making them secure, or returning them to the boats every night when they left work, was very great.