Masshouse is a development site in Birmingham, United Kingdom where 13 highrise blocks are being constructed for public services, commerce and residential purposes. When completed, the blocks will have a prominent position on the Eastside skyline.

History

The Masshouse area existed in the Victorian times as nothing else but Masshouse Lane. It was a small lane which was connected to Dale End and the junction at Albert Street and Duddeston Row. The name derives from the establishment of a Roman Catholic chapel (i.e. for the celebration of Mass) there by a Franciscan priest, Leo Randolph, in 1687, followed by a convent in March 1688. Both were burned down by a mob, instigated by the Protestant Lord Delamer, in November 1688.

Masshouse

Showell's Dictionary of Birmingham (1885) describes the building and destruction of the "mass house":

Masshouse

From 1749 to 1943 it was the site of St Bartholomew’s Church, Birmingham.

Masshouse

It was developed in the 1960s into an elevated road intersection on the A4400 road and was named Masshouse Circus. The area below it was cleared and used as a surface car park. The elevated roadways were made of concrete which created an appearance disliked by locals. Under the roads was a large car park with pedestrian subways. There were six subways:

New Meeting

Henns Walk

James Watt

Chapel Street

Ryder

Hospital

The ring road became known as the "concrete collar" and restricted the expansion of the city centre core beyond it into the east.

In March 2002, the roundabout was demolished to clear the land for development; this was referred to as the "breaking of the concrete collar". The work was carried out by Birse Civils and designed by Gifford & Partners in a contract worth £24.2 million. The contractors sought to reuse the of reinforced concrete that was removed during demolition. Over £9 million from the European Regional Development Fund was invested into the project.

A replacement road to connect the Bullring Shopping Centre with Jennens Road was completed and opened in August 2003. However, this was closed for a time due to a number of injuries to pedestrians. The road (B4100, Moor Street Queensway) is now open although a potential accident spot remains as buses using the Moor Street Queensway bus lane eastbound have to go around a pedestrian crossing point to continue along Queensway at Masshouse. However, the land was left as a car park for a number of years as plans and designs for the development were created. Pieces of the rubble collected from the demolished structure, were put on sale by the Birmingham branch of Friends of the Earth with a price tag of 50p per piece.

Development

Masshouse is now cleared and ready for development with the largest of the three sites being used as a temporary car park. It has been separated into two phases with Phase 1 retaining the Masshouse name and the other plot, Phase 2, being called City Park Gate, named after the new Eastside City Park to be constructed next to it.

Phase 1 will stretch from the McLaren Building to the Park Street. The scheme is being developed by David McLean Developments and has been designed by Edward Cullinan Architects. The entire scheme is expected to cost £350 million and provide of space.

The planning application for Block I was submitted in October 2004. Block I has been completed and the first residents moved into the building in December 2006. Construction of the 14-storey building cost £30 million and consists of 173 studio, one and two-bedroom apartments. Over 50% of the building's 173 apartments were sold in the first week of release. The building is clad in of pre-cast panels. They consist of a complex mixture of finishes with some containing black polished bands bounded by a white concrete frame and finished to two different levels of exposure. The top floor penthouse apartments are clad with grey polished pre-cast panels. Many of the main cladding panels are either concave or convex with pointed ends and most will be pre-fitted with windows at the Techrete factory to accelerate the construction process.

In March 2007, an outline planning application was submitted to Birmingham City Council by GVA Grimley to build a mixed-use development of up to (gross internal area) on Plot 7. The application consisted of four buildings for retail, office, hotel and residential use.

The entire scheme aims to create of Grade A office accommodation, 550 high specification apartments, Ground floor cafes, restaurants and retail units, Two new public squares, with traffic free landscaped areas, water features and public art and 800 car parking spaces.