The Eveleigh Chief Mechanical Engineers office is a heritage-listed former engineer's office and now unused building located at Main Suburban railway line in the inner western Sydney suburb of Redfern in the City of Sydney local government area of New South Wales, Australia. The building fronts 505 Wilson Street, opposite Shepherds Lane, Eveleigh. It was built in 1887. It is also known as Eveleigh Chief Mechanical Engineers office and movable relics and Sydney Technology Park. The property is owned by Transport for NSW, an agency of the Government of New South Wales. It was added to the New South Wales State Heritage Register on 2 April 1999.

History

The Chief Mechanical Engineers Office was constructed in as part of the expansion of the Eveleigh Workshops. The building was extended to the east in c.1900, almost doubling in size. A small extension was carried out to the southern side .

Eveleigh Chief Mechanical Engineer's office

When John Whitton first conceived the idea of the Eveleigh Railway Workshops, they were to undertake the construction of the infrastructure of the railways including the safe working systems and some of the perway systems. However, their main tasks were the maintenance and repair of locomotives and railway stock and the manufacture of rolling stock such as wagons and passenger carriages. At the time there were no other facilities in NSW for the construction of locomotives.

Eveleigh Chief Mechanical Engineer's office

The workshops were set up on both the north and the south sides of the main western and southern railway lines, which led to a duplication of some workshop functions, but the really heavy work such as forging and casting of ferrous and non-ferrous metal, was to be carried out on the locomotive side. When the workshops were established most of the rolling stock had a wooden chassis, so the separation of services was not a major impediment to production.

Eveleigh Chief Mechanical Engineer's office

The site for the Eveleigh railway yards was chosen in 1875, resumed in 1878 and the compensation price settled in 1880. Approximately A£100,000 was paid for of land. Clearance began two years later. Much work went into the design and construction of the buildings because of the sandy nature of the soil. In the meantime, Eveleigh Station had been opened in 1878. In 1906 it was renamed Redfern Station. The former Redfern Station was renamed Sydney Terminal (Central).

The Engine Running Shed, now demolished, was the first building completed. Cowdery was criticised for the extravagance of this building. It comprised three segmental arched bays, each covering seven "roads" without intervening columns.

George Fishburn was awarded the contract for bays 1-4 of the Locomotive Workshops in 1884 and work was commenced soon after. They were officially opened in 1887. Workshops 5-15 were opened later in the year. This initial building phase also included the construction of bays 16-25 of the Carriage Sheds, the Paint Shop, a General Store and various smaller buildings and the associated turntables, traversers and rail lines. Development continued into the 1890s. The workshops were open every day of the week until 1892 when union negotiations led to the workshops being closed on Saturdays.

The residential development of the area proceeded in the 1870s and 1880s around the railway workshop and was stimulated by the need for housing generated by the workshops. The names of many early settlers are continued in the street names in the area, including Eveleigh, and many of the property boundaries and former watercourses are reflected in street patterns. At the time of the development of the railway workshops, Darlington School was also built, as were other municipal buildings since demolished for the university.

For some time Eveleigh had its own gas works which were located near MacDonaldtown Station. However, in 1901 with the establishment of Ultimo Power Station which belonged to the Rail and Tramway Department, electric power was made available to the workshops. Shortly after work commenced on the conversion of the rope-driven cranes to electric motor drives. Work also commenced on the replacement of the steam engines at the south end of the workshops by powerful electric motors. This, however, was not completed until 1914.

In 1907 the Commissioners for Railways decided to begin the manufacture of new locomotives at Eveleigh and the New Locomotive Shop was designed and constructed for this purpose.