The process of assembling the International Space Station (ISS) has been under way since the 1990s. Zarya, the first ISS module, was launched by a Proton rocket on 20 November 1998. The STS-88 Space Shuttle mission followed two weeks after Zarya was launched, bringing Unity, the first of three node modules, and connecting it to Zarya. This bare 2-module core of the ISS remained uncrewed for the next one and a half years, until in July 2000 the Russian module Zvezda was launched by a Proton rocket, allowing a maximum crew of three astronauts or cosmonauts to be on the ISS permanently.
The ISS has a pressurized volume of approximately , a mass of approximately , approximately 100 kilowatts of power output, a truss long, modules long, and a crew of seven. Building the complete station required more than 40 assembly flights. As of 2020, 36 Space Shuttle flights delivered ISS elements. Other assembly flights consisted of modules lifted by the Falcon 9, Russian Proton rocket or, in the case of Pirs and Poisk, the Soyuz-U rocket.
Some of the larger modules include: Zarya (launched 20 November 1998) Unity Module (launched 4 December 1998, also known as Node 1) Zvezda (launched 12 July 2000) Destiny Laboratory Module (launched 7 February 2001) Harmony Module (launched 23 October 2007, also known as Node 2) Columbus orbital facility (launched 7 February 2008) Japanese Experiment Module, also known as Kibō (launched in multiple flights between 2008 and 2009) The truss, original and iROSA solar panels (unpressurized, truss and original panels launched in multiple flights between 2000 and 2009, iROSAs launched between 2021 and 2025) Nauka (MLM-U) (launched 21 July 2021)
Logistics
The space station is located in orbit around the Earth at an altitude of approximately , a type of orbit usually termed low Earth orbit (the actual height varies over time by several kilometers due to atmospheric drag and reboosts). It orbits Earth in a period of about 90 minutes; by August 2007 it had completed more than 50,000 orbits since launch of Zarya on 20 November 1998.
A total of 14 main pressurized modules were scheduled to be part of the ISS by its completion date in 2010. A number of smaller pressurized sections will be adjunct to them (Soyuz spacecraft (permanently 2 as lifeboats – 6 months rotations), Progress transporters (2 or more), the Quest and Pirs airlocks, as well as periodically the H-II Transfer Vehicle).
The US Orbital Segment was completed in 2011 after the installation of the Alpha Magnetic Spectrometer during the STS-134 mission. The Russian Orbital Segment assembly has been on an indefinite hiatus since the installation of the Rassvet module in 2010 during the STS-132 mission. The Rassvet module on the ISS right now was originally supposed to be the on-ground dynamic testing mock-up of the now-cancelled Science Power Platform. The Nauka science laboratory module contains new crew quarters, life support equipment that can produce oxygen and water, and a new galley. The Nauka was originally supposed to be delivered to the ISS in 2007 but cost overruns and quality control problems delayed it for over a decade. The Nauka module finally launched in July 2021 and docked to the nadir port of Zvezda module after several days of free flight followed by the Prichal which launched on 24 November 2021.
There are plans to add 2 or 3 more modules that would attach to Prichal during the mid-2020s. Adding more Russian modules will help the Zvezda module greatly because Zvezda's originally installed central command computers no longer work (three ThinkPad laptops are now the Zvezda's central command computers) and its Elektron oxygen generators are not replaceable and failed again for a short time in 2020 after multiple malfunctions throughout their history. In Russian modules all the hardware is launched with the equipment permanently installed. It is impossible to replace hardware like in the US Orbital Segment with its very wide 51 inch (105 cm) hatch openings between modules. This potential problem with the Zvezda was made apparent when in October 2020 the toilet, oven, and Elektron all malfunctioned at the same time and the cosmonauts onboard had to make emergency repairs.