SA Ateliers de Constructions Electriques de Charleroi (ACEC) was a Belgian manufacturer of electrical generation, transmission, transport, lighting and industrial equipment, with origins dating to the late 19th century as a successor to the Société Électricité et Hydraulique founded by .

After World War II the company expanded into electronics, and became a contractor to the nuclear industry. The company was acquired by Westinghouse in 1970; in 1985 Westinghouse's share was acquired by Société Générale de Belgique (SGB) and Compagnie Générale d'Electricité (CGE).

Ateliers de Constructions Electriques de Charleroi

The company operated at a loss during the 1980s, and was split and sold; Alstom and its affiliates acquired the majority of the company, along with ABB and Alcatel Bell and others. The remnants of the company were merged into Union Minière in 1989, forming ACEC Union Minière.

Ateliers de Constructions Electriques de Charleroi

History

Background, 1878–1904

In 1878 Julien Dulait (1855–1926), son of steelworks engineer Jules Dulait began experiments into electrical and hydraulic machines; with co-worker Désiré Barras he created an electricity generating machine powered by an hydroelectric turbine. In 1881 the Compagnie générale d'Electricité was formed in Charleroi with Dulait as consulting engineer, constructing machines to Dulait's designs and those of Zénobe Gramme.

Ateliers de Constructions Electriques de Charleroi

In 1886 the company was renamed becoming Société anonyme Électricité et Hydraulique à Charleroi (E&H), by this time the factory was producing dynamos with over 100 kW power. By 1900 the company had supplied electric lighting to the cities of Liege, Charleroi and Schaerbeek, and opened a new factory in Marcinelle/Marchienne. In 1904 the company supplied trams for a line in Cointe, Liege- – the first entirely Belgian built trams.

The company's product range included dynamos, lifts, carbon arc lamps, electric traction motors for trams and drilling equipment.

In 1898, the company established a factory in France in Jeumont (France/Belgium border).

On 7 July 1904, the company became Ateliers de Constructions électriques de Charleroi (ACEC), having been acquired by Baron Edouard Empain; Empain made an entry into the electrical industry in an attempt to counter German companies' share of the Belgian market.

The Jeumont, France factory was renamed Ateliers de constructions électriques du Nord et de l'Est (ACENE) in 1906; much later (1960s) becoming part of Jeumont Schneider.

ACEC, 1904–1970

After foundation in 1904 the company expanded in the next decade, establishing several new factories including ones for electrical cables, machine and tool making, and large scale machines. In 1914 the company began manufacturing motor vehicles, with an electric transmission system, to the design of Balachowsky & Caire. During World War I the factory was stripped of machines by occupying German forces.

In the interwar period ACEC began to produce vacuum-based electronics, including mercury arc rectifiers – in 1929 mercury-arc rectifiers were installed on Bruxelles tram system replacing rotary converters. The company also produced a high-power test installation, capable of producing 2.5GW in short circuit, with currents and voltages of up to 267kA and 250kV.

In 1939 ACEC began to collaborate with Constructions Electriques de Belgique (CEB), with the two companies rationalising their combined production.

During the buildup to World War II the factory was commissioned to manufacture 75mm anti-aircraft guns, 47mm antitank guns and other weapons, as well as variable-pitch propellers and parts for Hispano-Suiza aircraft. After the outbreak of war preparations were made to relocate the factories – some production was restarted at a Hispano-Suiza factory near Tarbes, France. The Charleroi plant was initially taken under the control of the German armed forces. By 1942 raw materials, and manufactured parts and tools were beginning to become scarce, in 1942/2 workers at the plant began to be commandeered to work in factories in Germany mainly those of AEG, Siemens and Brown-Boveri.

In 1947 the collaboration with CEB concluded with the two companies merging, forming ACEC Herstal.

ACEC also acted as a contractor and equipment supplier to the nuclear industry, supplying sensor and handling systems including fuel rod handling, pumps for coolant systems and instrumentation, as well as conventional power plant equipment such as main generators, pumps, control systems, instrumentation and computer systems. In 1957, the company entered into a licensing arrangement with Westinghouse relating to PWR reactors.