The Great Northern route (formerly known as Great Northern Electrics) is the name given to suburban rail services run on the southern end of Britain's East Coast Main Line and its associated branches. Services operate to or from and in London. Destinations include , , , and , and in peak hours, additional services run to and . Services run through parts of Greater London, Hertfordshire, Bedfordshire, Cambridgeshire, and Norfolk.
The route forms a major commuter route into London from Hertfordshire, Cambridgeshire, and eastern Bedfordshire: ridership has grown rapidly over recent years. In 2009, rolling stock was transferred from other lines to allow additional services and longer trains to be run. In early 2018, the line was connected to the Thameslink route via a junction just south of the High Speed 1 bridge, north of King's Cross, allowing through services to the south of London.
Since September 2014, the services have been operated by Govia Thameslink Railway (GTR). The Thameslink and Great Northern service brands were maintained and separated from each other.
Route
The network consists of all local and semi-fast services on these lines: East Coast Main Line south of Peterborough Northern City Line Hertford Loop Line Cambridge Line
Additionally, the main service on the Fen Line is provided as part of the route. All services are provided by EMUs.
At privatisation the services became part of West Anglia Great Northern, becoming their sole route in 2004 when the West Anglia services were transferred to 'one'. In April 2006 the services became the responsibility of First Capital Connect. In September 2014, the Department for Transport transferred the new Thameslink, Southern and Great Northern franchise to Govia Thameslink Railway. In 2018, with the completion of the Thameslink Programme, many services on the route became part of the Thameslink network, running through central London to destinations south of the River Thames.
History
The term Great Northern is related to the Great Northern Railway, the original builders of the line.
The July 1922 Bradshaw's Railway Guide stated a typical rail service on the Cambridge Line as follows:
to - Six stopping and two (three on Saturday) semi-fast services from Monday to Saturday, one northbound and two southbound stopping services on Sunday. The fastest service took about 1 hour 30 minutes. London King's Cross to - Two (three on Wednesday) additional services from Monday to Saturday, one additional service on Sunday. London King's Cross to - Seven additional services from Monday to Saturday. London King's Cross to - Three additional services from Monday to Saturday. The last service on Wednesday ran past midnight into Thursday morning.
Since the 1960s, Great Northern has been used to describe the suburban part of the East Coast Main Line, south of and south of . The Great Northern Railway had proposed electrification of part of the line in 1903, but it was not until 1971 that a scheme to electrify the line from and was authorised.
The Inner Suburban Lines to and were electrified in 1976 with EMUs. In 1978 the electrification was complete to Royston with EMUs providing the service. The route was then promoted as the Great Northern Electrics. The route between Hertford and Langley Junction, south of , was also electrified but not regularly used by electric trains until 1979, when one Moorgate - Hertford service per hour was extended to ; prior to this DMUs provided an infrequent service over this route, running between Hertford and / Peterborough. From 1979 until 1987 DMUs provided the service between Hitchin and Huntingdon/Peterborough. DMUs also provided a shuttle service between Royston and Cambridge between 1978 and 1988, connecting with the electric trains and replacing the former through Cambridge buffet expresses between Kings Cross and the university city.
In 1982 Watton-at-Stone station was reopened between Hertford and Stevenage. A new station also opened at in 1986.
With the further electrification of the East Coast Main Line between 1986 and 1988, electric services could be extended to Peterborough and the outer suburban service was changed from to , some of which were cascaded from the newly created Thameslink route, with the remainder newly built.