The Washington Park & Zoo Railway (WP&ZRy) is a narrow gauge recreational railroad in Portland, Oregon's Washington Park with rolling stock built to 5/8 scale. Opened in three stages in 1958, 1959 and 1960, it previously provided transportation between the Oregon Zoo, Hoyt Arboretum, International Rose Test Garden, and the World Forestry Center. The extended line through Washington Park, now out of service but still in place, was about long. The service is currently operating on a loop completely within the Oregon Zoo grounds. The railway carries about 350,000 passengers per year.
The railroad is operational year-round when the Oregon Zoo is open, except in January and part of February, when it is closed for required maintenance. Special events occur during the winter holidays. As of 2023, the price of a ticket was $5.00 for the short 6-minute internal loop within the zoo grounds, but zoo admission was also required.
Zoo officials announced in September 2013 that the line would be closed for about one year for construction, with the last day of service scheduled on September 22. The temporary closure was necessitated by the construction of the zoo's new Elephant Lands exhibit, which will also include remodeling of other parts of the zoo grounds. The short-loop route through the southwest part of the zoo grounds was scheduled to be removed permanently, and during the one-year suspension of service a new section of track was to be laid to create a replacement for the short loop. Train operations returned running on the new Zoo Loop line, within the Oregon Zoo only, as of November 22, 2014.
In May 2018 an online petition was created in opposition to the Washington Park Master Plan's endorsement to remove the "long route", which runs from the Oregon Zoo to the International Rose Test Garden. The master plan primarily called for the removal of all tracks so that it could be replaced by a paved twelve foot (12') wide path. As of May 2020, over 37,000 people have signed the online petition in support of keeping and repairing the, "long route". As of 2023, no action has yet been taken on this proposed Washington Park plan.
History
Originally named the Portland Zoo Railway, the first section of track opened for service on June 7, 1958, and was formally dedicated on June 9, more than a year before the zoo opened fully at the same site. This service used the Zooliner trainset, the railway's first and only train at that time, and operated daily except Mondays through the summer. Meanwhile, the zoo's new West Hills site was only open on weekends, because it was still under construction, and even by August penguins and bears were the only animals moved from the old zoo, which remained in operation. The initial train service around the yet-unfinished new zoo grounds was suspended in mid-September 1958, not to resume until the zoo's opening in July 1959. A fundraising campaign was launched, to raise money to build an extension – outside the zoo grounds – through the woods of Washington Park and also to build a steam locomotive. It was decided to model the planned steam engine on a real one, a Baldwin 4-4-0 type, and construction began in the autumn, with plans to use it initially at the Oregon Centennial Exposition, scheduled to be held the following summer in North Portland (at the site of what is now the Portland Expo Center). The steam engine was named "Oregon", or alternatively "the Oregon".
In the summer of 1959, the Portland Zoo Railway operated trains at two different sites. Nos. 1 and 2, the Oregon and the Zooliner, served a temporary railway line through the grounds of the Centennial Exposition, which lasted for about three months. The Zooliner entered service on the exposition's opening day, June 10, along with a second train hauled by a utilitarian diesel switcher locomotive temporarily filling in until the new steam locomotive, No. 1, was ready. The steam locomotive entered service on June 20, and it and the streamlined Zooliner proceeded to carry passengers daily at the exposition all summer.
Meanwhile, the railroad at the zoo's then-new site in the West Hills remained closed while construction continued on the zoo itself, but reopened on the latter's opening day, July 3, 1959 (by which time most animals had been moved from the old zoo). For the next few months, the zoo line was served only by a train hauled by the locomotive that had been used during construction of that line. That locomotive (later becoming No. 5) was a diesel engine made to look like a steam locomotive, and the train was called the Circus Train. The engine and its cars have been modified several times since and are currently known as the Oregon Express.