Line 8 of the Shenzhen Metro (also known as the Yantian line) is an East-West line from Liantang to . It opened on 28 October 2020. Line 8 has a length of and a total of 7 stations. Line 8 is the first line to serve Yantian District. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.

Timeline

Service routes

—

— (Working days peak hours only)

Line 8 (Shenzhen Metro)

Stations

Phase 2 & Phase 3

Phase 2 and Phase 3 both under construction. Phase 2 from Yantian Road to Xiaomeisha, opening in 2023. Phase 3 from Xiaomeisha to Xichong, opening in 2025.

Line 8 (Shenzhen Metro)

Rolling Stock

Notes

References

Shenzhen Metro lines

Transport infrastructure under construction in China

Line 8 (Shenzhen Metro)