USS Alhena (AKA-9) was an attack cargo ship named after Alhena, a star in the constellation Gemini. Robin Kettering had been purchased from Robin Line of the Seas Shipping Company some four months after launch and served as a commissioned ship for five years and four months. On 12 September 1946 the ship was transferred to the War Shipping Administration and placed in reserve until repurchased by Seas Shipping for operation as Robin Kettering. In 1957 the ship was sold, renamed Flying Hawk operating in cargo—passenger service until sold for scrap in 1971.

Construction

Robin Kettering was the third of three geared turbine, modified C2-S type ships for the Seas Shipping Company's Robin Line by the Bethlehem Shipbuilding Corporation at its Bethlehem Sparrows Point Shipyard, Maryland yard under a Maritime Commission contract. The ships had sequential MC and yard hull numbers: Robin Locksley 72/4341, 73/4342, and Robin Kettering 74/4343. One of the modifications for these ships was increased length, approximately that of the C3 type, no bow or stern sheer and a flat, broad funnel. The last ship's keel was laid on 19 June 1940 with launch on 18 January 1941 sponsored by Mrs. William Sanford Lewis. The ship was delivered on 29 May 1941 and registered with official number 240632.

USS Alhena

As built the ship was , , length overall, length between perpendiculars, beam with a depth of and a draft of . The ship had a bale capacity of , or a grain capacity of , as well as capacity for of refrigerated cargo, and special cargo space in five holds. Carrying water and coal, she had a range of . She had a crew of 43 and could carry twelve passengers. The ship had sixteen 5-ton derricks, one 10-ton derrick and one 30-ton derrick to allow loading and unloading of cargo.

USS Alhena

Two steam turbines drove a single screw propeller of diameter. The turbines were rated at 6,300 shp and driving the propeller at 85 rpm, they could propel her at a normal service speed of , with a maximum speed of .

USS Alhena

Naval service

On 31 May 1941 the ship was purchased by the Navy from the Robin Line of the Seas Shipping Co., Inc., of New York City; commissioned as Alhena (AK-26) at Hoboken, N.J., on 15 June 1941.

Service history

Following final fitting out and shakedown training, the cargo ship began operating among ports on the East Coast of the United States. The ship arrived at Boston on 13 December to take on cargo for NS Argentia, Newfoundland. She completed her run to that port by the end of December and then proceeded to Brooklyn, N.Y., to refill her holds.

Voyage to Europe

She picked up more cargo at Norfolk, Va., in mid-January 1942 and returned to New York City to embark troops before getting underway on 5 February for Europe. On the next day, the ship was officially assigned to the Naval Transportation Service.

After touching at Halifax, Nova Scotia, Alhena reached Belfast, Northern Ireland, on 27 February and remained there for approximately two weeks discharging her passengers, equipment, and supplies. She made a stop at Clydebank, Scotland, on 14 March and sailed two days later for the United States. The vessel reached New York on the 25th.

Assigned to the Pacific

The ship departed the east coast on 9 April, bound for the Canal Zone; transited the canal on the 19th; and set her course for the Tonga Islands. She reached Tongatapu on 9 May; landed Army and Navy personnel; left that island two weeks later; and arrived at San Diego, California, on 5 June. While in port, the vessel underwent repairs and alterations before taking on marines and equipment for transportation to the South Pacific.

Assault on the Solomon Islands

On 1 July, Alhena got underway for Tongatapu. Upon her arrival there, she was assigned to Amphibious Forces, Pacific Fleet. A few days later, the vessel sailed to the Fiji Islands to participate in amphibious landing exercises in preparation for the American thrust into the Solomon Islands in which United States forces would take the offensive for the first time in World War II. After completing the exercises, she sortied with Task Group (TG) 62.1 for Guadalcanal, arrived off that island on 7 August, and began unloading operations. In spite of heavy enemy air attacks, the ship carried out her task successfully and got underway on the evening of the 9th for Espiritu Santo, New Hebrides, where she arrived the next morning. The ship took on another load of cargo; set out for the Solomons on the 20th; reached Tulagi two days later; and began discharging sorely needed supplies. She meanwhile took on casualties and prisoners of war for evacuation to Espiritu Santo and reached that island on 24 August.