The Public Works department shared a slide deck with the Development Industry Liaison Group in July 2021 that includes the following statistics about the City of Hamilton’s Wastewater system in 2020: 113,975,000 cubic litres of wastewater treated in 2020 71 storm mode activations 1,387,000 cubic litres of untreated wastewater were released during 12 events 95 other combined sewer outflow events 74 to 82% Average capacity utilization at the Woodwater WWTP 2020 Overflow Performance Summary Woodward WWTP Secondary Bypass Events – 12 CSO Volume (ML) – 1,386.94 CSO Duration (hrs) – 146.36 Cootes Paradise CSO Outfall Sites – 8 CSO Volume (m3) – 35,852 CSO Duration (hrs) – 42.2 Hamilton Harbour CSO Outfall Sites – 17 CSO Volume (m3) – 911,242 CSO Duration (hrs) – 1,738.3 Red Hill Creek CSO Outfall Sites – 6 CSO Volume (m3) – 22,711 CSO Duration (hrs) – 98.7
Diaspora Report
STATS: Hamilton Wastewater Slide on 2020 Performance Stats – TPR Hamilton | Hamilton's Civic Affairs News Site
Tags