The tube, when in position, was lowered down upon its bearings on the pier by opening valves in the pontoons, which thus sunk sufficiently to ease them of their load.

The work of raising the tube to its position, 100 feet above high water mark, was a much slower operation, and was attended with serious difficulties. Hydraulic presses were used for the purpose, placed at the top of the piers; two smaller ones, which had served to raise the Conway Bridge, being at one end, and a much larger press, made for the occasion, being fixed at the other. The immense tube was lifted by chains fixed to the heads of the presses, and two steam engines, of 40-horse power each, were employed to force the water into the cylinders. The diameter of the ram of the largest hydraulic press was 20 inches, and the pressure upon it was equal to 2¼ tons on each circular inch. The tube was raised by successive lifts of 6 feet each, and, as it was lifted, the space was built in with masonry for its ultimate bearing. During the operation of lifting, the bottom of the cylinder of the large hydraulic press burst out, and fell on the top of the tube, in which it made a considerable indentation. Mr. Stephenson had provided against the possibility of such accident, by having blocks of wood, an inch thick, introduced under the tube as it was elevated, and these blocks arrested its fall, or it would otherwise have been dashed to pieces. Even the small fall of an inch did considerable injury. This accident caused some delay, but the other tubes were in the meantime progressing, and the completed bridge was opened for public traffic on the 21st of October, 1850.

Great Facts — Part 145

The strength of the bridge was tested before passenger trains were allowed to pass through it, by placing in the centre of the longest tubes twenty-eight waggons, loaded with 280 tons of coal, and two locomotives, and by afterwards sending those heavy trains through the bridge at full speed. The deflection of the tubes in the centre amounted to only three-quarters of an inch in each cell; it being rather less when the trains were at full speed than when stationary. The strongest gusts of wind to which the bridge has been exposed have not caused a vibration of more than one inch. The total cost of construction was £601,865; of which sum £3,986 was for experiments, and £158,704 for masonry.

Great Facts — Part 145