I need hardly say that this advice would perhaps not have been given at the present day, when even creosote has been found to delay, though not to act as a perfect defence against, the ravages of the _Limnoria_.[10]

At a more recent period Mr. Stevenson experimented at the Bell Rock Lighthouse in the same way on twenty-five different kinds of malleable iron, with the result that all of them were soon affected, and that galvanised specimens resisted oxidation from three to four years, after which the chemical action went on as quickly as in the others.

Life of Robert Stevenson — Part 102

Marykirk, Annan, Stirling, and Hutcheson stone bridges--High-level bridge for Newcastle--Timber bridge of built planks--Winch Chain Bridge--American bridges of suspension--Runcorn Bridge--Menai Chain Bridge--New form of suspension bridge.

Life of Robert Stevenson — Part 102

Mr. Stevenson’s stone bridges over the North Esk at Marykirk, and the Nith at Annan (Plate VI.), are good specimens of road bridges of moderate extent; and his bridge over the Forth at Stirling, and Hutcheson Bridge over the Clyde at Glasgow (Plate VII.), are structures of a larger class.

Life of Robert Stevenson — Part 102

Of the latter, Mr. Fenwick, of the Royal Military Academy, Woolwich, in the preface to his work on the _Mechanics of Construction_, published in 1861, says,--“The London and Waterloo Bridges, in the metropolis, which rank among the finest structures of the _elliptical arch_, and Stevenson’s Hutcheson Bridge at Glasgow, which is one of the best specimens of the _segmental arch_, together with many others, have supplied me with a variety of problems for illustration.”

DESIGN FOR HIGH LEVEL ROAD BRIDGE AT NEWCASTLE ON TYNE. 1828.

The Hutcheson Bridge was completed in 1832. The masonry of the piers was laid at the level of seven feet below the bed of the Clyde, on a platform of timber, on piles eighteen feet in length. I found by a section made in 1845, after a lapse of thirteen years, that the level of the river had been lowered, in consequence of the deepening of the river Clyde by the Navigation Trustees, no less than eleven feet, and even with that amount of scour the bridge was, and might long have remained, a safe structure. But immediately above its site there is a weir which dams up the Clyde and forms a lake, or almost still pool, in the river’s bed for several miles. It was determined, in the interests of navigation, to take powers to remove the weir, and on its removal the bridge could, no longer be pronounced safe; it was also resolved to take powers to replace the Hutcheson by the new Albert Bridge, designed by Messrs. Bell and Miller.