Sidrapong Hydroelectric Power Station ( Sidrapong Hydel Power Station), located at the foothills of Arya Tea Estate from Darjeeling town, is the oldest hydel power station or hydroelectric power plant in India. commissioned on 10 November 1897, its original capacity was 2 × 65 kW, which was expanded in phases for increased demands to a total 1000 kW in 1916. Having reached the limit of the water supply, the machinery was replaced in 1931 for more-efficient triple-phase transmission.

The station uses water from the (Nepalese for 'streams') Kotwali, Hospital and Barbatia, channeled through a network of flumes to reservoirs, then passed down penstocks to the generators.

Sidrapong Hydroelectric Power Station

West Bengal State Electricity Board (WBSEB) took over operation of the station when it absorbed Darjeeling Electric Supply in 1978. In the 1980s, the station was damaged due to a landslide and remained closed for a decade, but was revived in 1997 to mark its centenary. The station has been accorded cultural heritage status by the central government.

Sidrapong Hydroelectric Power Station

Approaches

There are 2 approaches to the station. The first is via Arya Tea Estate. The road to the tea factory building is well laid and accessible by vehicles, covering a distance of from Darjeeling. Beyond the tea factory, there is a steep pony track to Sidrapong Forebay. Though not completely developed, this approach offers scenic views of the tea gardens.

Sidrapong Hydroelectric Power Station

The second and more-popular approach is via Bloomfield tea factory, covering a stretch of . The former foot track beyond Bloomfield factory was developed by the Darjeeling Gorkha Hill Council to a metalled road (gravel road) with a bridge across the Kotwali Jhora to the Sidrapong Forebay.

History

On 11 February 1896, the Municipal Commissioners of Darjeeling decided to set up a hydroelectric power station for the purpose of lighting the town. A loan of 1 lakh (100,000) was secured from the government, and a site for the power station was selected at the foot of the Arya Tea Estate at Sidrapong. The site was then a fine orchard of the Maharajah of Burdwan, who was pleased to hand it over to the municipality for the importance of the public interest. The work for the installation of a power station started immediately, with machines and equipment imported from Britain. There being no proper road communication, all equipment, machinery and materials had to be transported manually—a Herculean task, inconceivable in the present day.

The first plant consisted of two 65 kW Crompton-Brunton single-phase, 2300 volt 83.3 Hz alternators coupled with two Gunther's turbines. India's first hydroelectric power station with 2 × 65 kW capacity was commissioned on 10 November 1897 by Sir C. C. Stevens, the Acting Lieutenant Governor of Bengal. It is a noteworthy fact that the first power utility run on a commercial basis for the use of the general public in India was developed by the public sector under state patronage. The total initial cost of installation of this power station was only 1.2 lakhs (120,000 rupees).

For the first few years Darjeeling Municipality had to run Sidrapong Hydel Power Station at a loss, there being few consumers of electrical power. But as the demand grew, a 135 kW set was added in 1905 and a third 135 kW set was installed in 1909 in the same power house. A new power house was built in 1916 at a higher location, now known as Jubilee Power House. In this way, the total capacity of the station grew from 130 kW to 1000 kW. However, the limited supply of water meant that power generation could not be increased to match the growing demand of the town and of the factories at the neighbouring tea gardens. Various schemes were prepared to install a larger power station elsewhere. In 1914, while surveying for such, Municipal Engineer George P. Robertson drowned in the Great Rangeet River.

In the meantime, the demand for power grew rapidly, while the old single-phase system of supply had become out-dated as it suffered from transmission losses. On 9 June 1931, the Municipal Commissioners resolved to modernize the power supply by replacing the old machines and switching from single-phase 83 Hz to three-phase 50 Hz.