Another and more serious trouble was the lack of men; for if the engineers had to scour the army for men to make and organise the water-transport, they had to use a fine comb to get the railwaymen, since only a small percentage had been allowed to enlist in the first place. However, by the aid of the system aforementioned, they got together sufficient to meet the needs of the moment. The bulk of the men had originally been recruited from two of the great English railways, and either by accident or design, probably the latter, the authorities kept the men from each railway in separate companies.

The keenness was terrific. Right from the moment when the railway first thrust its shining tentacles across the desert, there was a competition between the two as to which could lay the longer stretch of line in a day's work. Aided and abetted by the "Camels" and the E.L.C., they progressed at an astonishing pace, and in spite of all drawbacks from sand and the terrible heat, an average rate of one mile of line a day was maintained.

With Our Army in Palestine — Part 33

To the uninitiated it may seem that railway-making in the desert is a mere matter of dropping sleepers on to the sand as far as you want to go, bolting the rails on to them, and running non-stop expresses at once. On the contrary, except that no rivers had to be bridged nor tunnels made, laying a line over the desert requires at least as much care and preparation as elsewhere. For if there is one thing certain about this unchanging land, it is that the contours of the desert are eternally changing. The sand is continually silting, and a khamseen may alter the whole surface of the land, yet to the eye it remains substantially the same. It is only when you come to study the desert in terms of the theodolite, so to speak, that you discover its mutability; that which is a hill to-day may be a plain to-morrow.

With Our Army in Palestine — Part 33

All this had to be considered in making the railway-bed, which must have a firm foundation of stones and a suitable embankment. To put a mile of line down in a day and maintain that rate is, then, a fairly creditable feat. Each company worked alternate days; sometimes one company would beat the record by a few yards, sometimes the other; there was little to choose between them from the point of view of efficiency.

With Our Army in Palestine — Part 33