The Jogeshwari–Vikhroli Link Road (JVLR), is a 6-lane road with a central median in Mumbai which connects the Western Express Highway and Eastern Express Highway providing speedier access from Jogeshwari in the Western Suburbs to Vikhroli in the Eastern Suburbs. It was opened to traffic in 1994, and widened from two to six lanes in 2012 at a cost of . The under-construction Line 6 of the Mumbai Metro is being constructed on this link road.

L&T flyover (Magnetic flyover) on this road has a gravity hill effect where vehicles seems to defy the gravity with the optical illusion of rolling up the slope.

Jogeshwari–Vikhroli Link Road

Route description

The corridor of land adjacent to JVLR on either side is being put to extensive and varied use. As the link road is developing into a major network connecting EEH and WEH, the land use pattern along the corridor has undergone a rapid change since it was opened to traffic in 1994. Open and barren wasteland space available in the western and middle sections of JVLR and the marshy land area in the eastern section of JVLR have been converted to residential, commercial and industrial land use pattern, albeit gradually. The entire 10.6 km long JVLR, starting from WEH and ending at EEH, is usually divided into three sections in various study reports, possibly for easy reference and understanding. The sections identified include:

Jogeshwari–Vikhroli Link Road

Western section

The segment of the JVLR which starts from the WEH junction and ends at the Saki Vihar road junction (near the L&T Factory) is referred to as Section 1 of JVLR. This section being located on the western side is also referred to as the western section of the JVLR. The length of this section is 4.9 km. The original carriageway of the western section of JVLR was a 2-lane road consisting of 7 m wide asphalted carriageway with 2.5m wide shoulders. This was later widened to a 6-lane divided carriageway configuration with a central median. A concrete pavement was also built for the six-lane widened carriageway, and a grade separator was built at SEEPZ road junction. The western section of JVLR passes through a slightly rolling terrain encountering a few steep slopes (max slope being 6.5%).

Jogeshwari–Vikhroli Link Road

The western section of the road starts from east of Jay coach Factory near WEH junction. From WEH, the road passes through a series of adjacent residential areas namely, Majeswadi, Pratap Nagar, Anand Nagar, Greenfields Society, Durga Nagar and Sariput Nagar. Towards the western end of this section, a commercial recreation park called Fantasy Land was located, which has been closed and replaced by Oberoi Splendor Grande housing complex on the northern side of JVLR. Towards east of this, the JVLR aligns along Kamal Amrohi Studios, State Government-owned Nursery, privately owned Matoshri Park, SEEPZ Industrial area, BSES Office, L&T Realty and Larsen & Toubro (L&T) factory. Between BSES and L&T factory, JVLR crosses over Aarey Farm area, Mithi River, and BMC Water Pipelines. Towards the end of this section, JVLR aligns through Milind Nagar and Tungawa hutments and meets Saki-Vihar Road opposite L&T Gate No 5.

The land use pattern along the western section of the JVLR is predominantly residential, especially the stretch along the western end of the section. Residential areas viz., Majaswadi, Pratapnagar, Anand Nagar, Green Field Society, Durga Nagar and Sariput Nagar are located along the western end of Section I of JVLR. The middle segment of this section passes through open hilly area and Aarey Farm area. Milind Nagar slums and Tungawa hutments on either side mark the eastern segment of the section. Besides residential land use, other major land uses observed along this section of JVLR are viz, industrial, commercial, and recreational. Major Industrial area viz. Santacruz Electronics and Export Promotion Zone (SEEPZ) is located along the road at Km 3+070. L&T factory located at the eastern end of Section 1 is one major industry located along the road. Towards the east of the SEEPZ area, lies an extension (Phase II of SEEPZ) of the industrial promotion zone.