In 1757 Essex recommended the removal of the galilee as being an encumbrance. The roof was ruinous, the walls were in bad condition; it was "neither ornamental nor useful"; it would cost a large sum to put it into decent repair. Happily this advice was not followed. In the course of the renovation then undertaken it was discovered that the remains of an older porch had been incorporated with the present one.
Bishop Northwold (1229-1254) commenced the building of the present presbytery.[8] There are now nine bays between the screen and the east end. The apse, if such were the termination of the Norman church, was situated between what are now on each side the fourth and fifth piers from the screen. A line drawn from the west side of the fifth piers north and south would just touch the eastern end of the apse. Bishop Northwold pulled down the apse and one bay west of it, and extended the presbytery four more bays to the east, building in all six bays, of which two were included in the ritual choir, and four were to the east of the high altar. All this was done between the years 1235 and 1251. The bishop also erected a lofty timber spire on the west tower, which remained until the present Decorated stage was built.
We have no account of the consecration of the Norman choir. But after this extension of the building eastwards we read that the whole church was solemnly dedicated on September 17, 1252, in honour of Saints Mary, Peter, and Etheldreda. King Henry III. was present, as well as Prince Edward, afterwards king. When the new portion of the church was ready, the remains of the four saints were removed further east. In the Norman church the high altar was in the chord of the apse, assuming one to have been built; after Bishop Northwold's alterations it was placed at the east end of the present sixth bay, where the apse terminated. The shrine of the foundress was placed some feet further to the east, its eastern face standing about twelve feet in front of the existing altar.
This work of Bishop Northwold completed the plan of the cathedral as it now stands. The lady-chapel was indeed built afterwards, but that is to all intents and purposes a separate building. Nor is there any later thirteenth-century work in the church itself. The building operations of the second half of the century were confined to the domestic part of the monastery. As these were doubtless carried out by the convent from its own resources, there is little notice to be found of them in the records of the see. It is known that the rectory, now in the deanery grounds, belonged to this period. It was finished in the time of Prior Hemmingston (1274-1288).