The Power Tower is the first high-rise office tower to attempt to meet the strict Passive House energy efficiency building standard. It was built to house the corporate headquarters of the Austrian utility company Energie AG in Linz, Austria.

In accordance with the Passive House standard the building has no connection to the local district heating system, and requires no fossil fuel inputs to maintain a comfortable interior climate, resulting in much lower carbon dioxide emissions than comparable buildings.

Power Tower (Linz)

History

In 2004 Energie AG decided to replace its corporate headquarters, built in the 1930s, with a much more efficient building. After an architectural competition the Zürich firm Weber/Hofer was chosen to lead the design effort. In the spring of 2006 construction began on the 3,750 m^2 lot. The site houses a parking garage, a two story building, and the 19-story office tower. Construction was completed in the late summer of 2008, and the building now provides offices for 600 employees of 13 different companies.

Power Tower (Linz)

Building Energy Systems

The Power Tower minimizes its external energy consumption via several integrated systems.

Power Tower (Linz)

Advanced Building Envelope

The building envelope was specially engineered to allow maximum daylighting while minimizing solar gain, which would normally be excessive and require a great deal of active cooling, given that two thirds of the facade is composed of glazing.

Geothermal Heating and Cooling

Beneath the building, 46 geothermal wells, each 150 m deep were drilled prior to construction.

References

External links

Energie AG Oberösterreich

Low-energy building

Sustainable buildings and structures

Sustainable architecture

Environmental design

Buildings and structures in Linz

Skyscraper office buildings in Austria

Skyscrapers in Austria

Office buildings completed in 2008