In addition to the Lidgerwood dirt trains there were a large number of trains made up of steel dump cars which were dumped by compressed air, and still other trains made up of small hand-dumped cars, and each class found its own peculiar uses.

As has been said, the problem of digging the big ditch has been one of the transportation of the spoil, and this has involved numerous difficulties. In Culebra Cut no little difficulty was experienced in keeping open enough tracks to afford the necessary room for dirt trains. Slides came down and forced track after track out of alignment, burying some of them beyond the hope of usable recovery; often the very bottom of the cut itself heaved up under the stress of the heavy weight of faulty strata on the sides of the mountain; and sometimes the slides and breaks threatened entirely to shut up one end of the cut.

The Panama Canal — Part 44

In hauling away the spoil one improvement after another was made in the interest of efficiency. It was found at first that the capacity of a big Lidgerwood flat car was only about 16 cubic yards, and that with a sideboard on only one side of the car, the load did not center well on the car, thus placing an undue strain on the wheels on one side. The transportation department, therefore, extended the bed of the car further out over the wheels on the open side, and this served a triple purpose--it permitted the steam shovels to load the cars so that the load rested in the center, increased the capacity of each car by about 3 yards, and permitted the unloader plow to throw the spoil further from the track, thus adding to the efficiency of the dumping apparatus.

The Panama Canal — Part 44

Frequent breaks in the trains were caused by worn couplers. These accidents were almost entirely overcome by equipping each train with a sort of "bridle" which prevented the separation of the cars in the event of the parting of a defective coupler. In the operation of the unloader plows it was found that the big cables frequently broke when a plow would strike an obstruction on the car, and this caused no end of annoyance and frequent delays. Then someone thought of putting between the cable and the plow a link whose breaking point was lower than that of the cable. After that when a plow struck an obstruction the cable did not part--the link simply gave way, and another was always at hand. On the big spreaders no less than 51 improvements were made, each the answer of the engineers to some challenge from the stubborn material with which they had to contend.

The Panama Canal — Part 44