The operator in his control house will be high enough to have an uninterrupted view of the whole flight of locks over which he has command. His control board will consist of a representation of the locks his switches control. On his model he will see the rise and fall of the fender chains as he operates them, the movement of the big lock gates as they swing open or shut, the opening and closing of the valves which regulate the water in the culverts, and the rise and fall of the water in the locks.

A system of interlocked levers will prevent him from doing the wrong thing in handling his switches. Before he can open the valves at one end of a lock he must close those at the other end. Before he can open the lock gates, the valves in the culverts must be set so that no harm can result. Before he can start to open a lock gate, he must first have released the miter-forcing machine that latches the gates. Before he can close the gates protected by a fender chain, he must first have thrown the switch to bring the fender chain back to its protecting position, and he can not throw the switch to lower the chain until he first has provided for the opening of the gate it protects. All of this interlocking system makes it next to impossible to err, and taking into consideration the additional safeguard of limit switches, which automatically cut off the power when anything goes wrong, it will be seen that the personal equation is all but removed from the situation.

The Panama Canal — Part 40

Culebra Cut! Here the barrier of the continental divide resisted to the utmost the attacks of the canal army; here disturbed and outraged Nature conspired with gross mountain mass to make the defense stronger and stronger; here was the mountain that must be moved. Here came the French, jauntily confident, to dig a narrow channel that would let their ships go through. The mountain was the victor. And then here came the Americans, confident but not jaunty. They weighed that mass, laid out the lines of a wider ditch, arranged complicated transportation systems to take away the half hundred million cubic yards of earth and rocks that they had measured. Nature came to the aid of the beleaguered mountain. The volcanic rocks were piled helter-skelter and when the ditch deepened the softer strata underneath refused to bear the burden and the slides, slowly and like glaciers, crept out into the ditch, burying shovels and sweeping aside the railway tracks. Even the bottom of the canal bulged up under the added stress of the heavier strata above.

The Panama Canal — Part 40