A mud engineer (correctly called a drilling fluids engineer, but most often referred to as the "mud man") works on an oil well or gas well drilling rig, and is responsible for ensuring the properties of the drilling fluid, also known as drilling mud, are within designed specifications.

Use of mud

Mud is a vital part of drilling operations. It provides hydrostatic pressure on the borehole wall to prevent uncontrolled production of reservoir fluids, lubricates and cools the drill bit, carries the drill cuttings up to the surface, forms a "filter-cake" on the borehole wall to prevent drilling fluid invasion, provides an information medium for well logging, and helps the drilling by fracturing the rock from the jets in the bit. To fulfill these tasks effectively, the mud contains carefully chosen additives to control its chemical and rheological properties.

Mud engineer

Drilling mud is usually a shear thinning non-Newtonian fluid of variable viscosity. When it is under more shear, such as in the pipe to the bit and through the bit nozzles, viscosity is lower which reduces pumping-power requirements. When returning to the surface through the much roomier annulus it is under less shear stress and becomes more viscous, and hence better able to carry the rock cuttings. Bentonite is commonly used as an additive to control and maintain viscosity, and also has the additional benefit of forming a mud-cake (also known as a filter cake) on the bore-hole wall, preventing fluid invasion.

Mud engineer

Barite is commonly used to "weight" the mud to maintain adequate hydrostatic pressure down-hole. This is critical in a drilling operation to avoid a kick and ultimately a blowout from uncontrolled production of formation fluids. The "mud-pits" at the surface have their levels carefully monitored, since an increase in the mud level indicates a kick is taking place, and may require shutting in the well and circulating heavier weighted drilling mud to prevent further formation fluid or gas production.

Mud engineer

Drilling fluid must be chemically compatible with the formations being drilled. Salinity must be chosen so as not to cause clay swelling or other problems. Mud can be "oil-based" or "water-based". In many areas oil-based muds are being phased out, as they are less environmentally friendly, although in some formations they are necessary because of chemical compatibility issues. Offshore rigs typically use synthetic oil based mud.

The job

The mud engineer (or drilling fluids engineer) may be a university, college, or technical institute graduate, having gained experience working on rigs. On land, this experience would come from being a derrick hand, and offshore, the experience would come from being a pump man. Prior to working on his own, he has been on a special training course, known as "mud school", and often spends time working with a senior mud engineer to gain experience.

Before the mid-1940s, the driller dealt with drilling mud; but specialization occurred with the increasing complexity and overlapped more with the geologist.

Prior to drilling a well, a "mud program" will be worked out according to the expected geology, in which products to be used, concentrations of those products, and fluid specifications at different depths are all predetermined. As the hole is drilled and gets deeper, more mud is required, and the mud engineer is responsible for making sure that the new mud to be added is made up to the required specifications. The chemical composition of the mud will be designed so as to stabilize the hole. It is sometimes necessary to completely change the mud to drill through a particular subsurface layer.

As drilling proceeds, the mud engineer will get information from other service providers such as the mud logger (mud logging technician) about progress through the geological zones, and will make regular physical and chemical checks on the drilling mud. In particular the Marsh funnel viscosity and the density are frequently checked. As drilling proceeds, the mud tends to accumulate small particles of the rocks which are being drilled through, and its properties change. It is the job of the mud engineer to specify additives to correct these changes, or to partially or wholly replace the mud when necessary. He or she must also keep an eye on the equipment which is used to pump the mud and to remove particles, and be prepared if the geologists' predictions are not entirely correct, or if other problems arise.

It is sometimes necessary to stabilize the wall of a borehole at a particular depth by pumping cement down through the mud system, and the mud engineer is sometimes in charge of this process.