The Z-Morh Tunnel is an under-construction 6.5 km long 2-lane road tunnel between Gagangair and Sonamarg in Ganderbal district of Union Territory of Jammu and Kashmir in India. It is named after the Z-shaped stretch of road that the tunnel will replace (Z-Morh translates to "Z-turn" in English). The road is avalanche-prone and gets blocked for several months. The Z-Morh tunnel will provide all-weather connectivity to the Sonamarg tourist town. It will take only 15 minutes to travel the 6.5 km long tunnel compared to hours over the zig-zag road up and down the hills.
Together with the adjacent Zoji-La Tunnel, this geostrategically important tunnel on the NH1 Srinagar-Leh Highway will provide year-round weather-proof connectivity to Baltal (Amarnath cave), Kargil and other places in Ladakh, enhance Indian Military logistics and boost tourism and economy. It is one of the 31 road tunnels, 20 in J&K and 11 in Ladakh, being constructed at a combined cost of INR1400 billion (~US$17.5 billion).
Benefits
The tunnel is being constructed near Gagangir in the Ganderbal District of the Indian Union Territory of Jammu and Kashmir, and has great strategic importance for India as it will provide quicker and year-long access to Zoji-la. Without this tunnel, the road is vulnerable to dangerous snowfall and avalanches, which necessitates its closure for several months in a year. The Z-Morh Tunnel, along with the Zoji-La Tunnel, located 325km west towards Leh, will ensure uninterrupted connection between Srinagar and Kargil. The completion of the Z-Morh tunnel will also significantly reduce the travel time between Srinagar and Leh as commuters will no longer need to stay overnight in Kargil to compete the trip.
The tunnel will increase social and economic development throughout the region and boost tourism in Sonamarg, which boasts attractions including the Thajiwas Glacier and activities such as whitewater rafting on the Sind River.
Features
The Z-Morh tunnel will be a two-lane bi-directional road tunnel between Gagangir and Sonmarg starting at 69.5 km stone and ending at 81.3 km stone on NH 1. The tunnel itself is 6.5 km long and the length of the approach roads between the tunnel portals and NH 1 will be 6.05 km for both ends. The tunnel will be 10 m wide with the 7.5 m wide parallel escape tunnel to be used both in an emergency and as the railway tunnel. The tunnel is designed for the flow of 1,000 vehicles an hour at an approved maximum speed of 80 km per hour. The tunnel is located at an elevation of above sea level. The total capital cost of the project was approved at ₹27 billion in July 2012. This includes ₹36.48 crore for the cost of land, resettlement, rehabilitation, and other pre-construction activities. The tunnel will help keep the highway open the entire year. The western portal of the tunnel (towards Srinagar) is located in the village Rezan just after Gagangir at and the eastern portal (towards Sonamarg) is located at village Shetkari at . There is a ventilation tunnel at Adit between the two portals. The tunneling is being built using the NATM tunneling method in view of the fragile Himalayan Geology.
Development and construction agency
Initially, the Z-Morh Tunnel was a 450 million dollar project being executed under PPP (DFBOT - Design, Build, Finance, Operate and Transfer Mode) by Srinagar-Sonamarg Tunnelway Limited, an Infrastructure Leasing & Financial Services (IL&FS) owned company which was also the concessionaire for the project.
Earlier, the project was envisaged to be implemented by the BRO as owner and nodal agency. However, it has now been transferred to the NHIDCL for implementation.
ITNL (IL&FS Group entity) was appointed as EPC contractor, which in turn has appointed Apco - Titan (Joint Venture) as a construction contractor for the project. The work was suspended by the construction contractor in July 2018 due to the financial stress of the concessionaire (IL&FS Group).
The Project Authority (NHIDCL) foreclosed the concession the agreement/contract with Srinagar Sonamarg Tunnelway Limited and reinvented the bidding for the construction of the balance work in June 2019. The revised (Balance Work) Total Project Cost stands at ₹2,378 crore (~USD 340 Million). The work needs to be completed in 42 months from the appointed date.
In August 2019, Apco Infratech emerged as the lowest bidder in the International Bidding Process, and in December 2019, the Project Authority issued a Letter of Award (LOA) for the project.