Istanbul Waste Power Plant () is a waste-to-energy facility in the Eyüp district of Istanbul near the Odayeri landfill, Turkey, using waste incineration. Opened in 2021 it is owned by the Istanbul Metropolitan Municipality (İBB) and operated by İstanbul Environmental Management Co. (İSTAÇ). It is Turkey's first power plant of this type.

Overview

The waste-to-energy plant was built by a consortium of the Swiss Hitachi Zosen Inova and the Turkish Makyol. Construction began on 16 September 2017. Located in the Işıklar (formerly Kısırmandıra) neighborhood of the Eyüp district of Istanbul, it was opened on 26 November 2021. The plant is owned by the Istanbul Metropolitan Municipality (İBB) and operated by İstanbul Environmental Management Co. (İSTAÇ), a subsidiary of the Metropolitan Municipality. It is Turkey's first waste-to-energy facility.

Istanbul Waste Power Plant

Characteristics

The plant is capable of incinerating 3,000 tons of waste daily, 15% of Istanbul's daily domestic waste. The three incinerators each of 1,000 tons capacity reach about . It can generate 78 MW⋅h electrical energy and 175 MW⋅h thermal energy. The generated electricity is equivalent to the needs of nearly 1.4 million people. A reduction of greenhouse gas emissions amounting to 1.38 million tons can be achieved, which is the amount of exhaust gas emission of about 700.000 vehicles. In 2021 the nearby Odayeri lanfill was estimated by Climate Trace to have emitted 3.7 milion tonnes. 90 people are employed in the facility. The plant saves a waste landfill storage area of .

Istanbul Waste Power Plant

References

Waste power stations in Turkey

Buildings and structures in Istanbul Province

Energy infrastructure completed in 2021

2021 establishments in Turkey

Eyüp

21st-century architecture in Turkey

Istanbul Waste Power Plant