Elephant Butte Dam or Elephant Butte Dike, originally Engle Dam, is a concrete gravity dam on the Rio Grande near Truth or Consequences, New Mexico. The dam impounds Elephant Butte Reservoir, which is used mainly for agriculture but also provides for recreation, hydroelectricity, and flood and sediment control. The construction of the dam has reduced the flow of the Rio Grande to a small stream for most of the year, with water being released only during the summer irrigation season or during times of exceptionally heavy snow melt.

Etymology

Elephant Butte is an exposed volcanic plug in Sierra County, New Mexico. The sides of the volcano have eroded away and left only the solidified butte-shaped core. It is now an island in the lake except at low-water levels, when it is connected to land by an isthmus. The butte was said to have the shape of an elephant lying on its side, and its name has been applied to the area since before the dam's construction. The nearby city of Elephant Butte was named for the rock formation.

Elephant Butte Dam

The original name of the dam was Engle Dam, after the nearby railroad stop at Engle, New Mexico. The stop was named "Engle" after the construction engineer R.L. Engle and was later renamed to "Engel" by the Santa Fe Railroad after their company's vice president, Edward Engel. Locals complained to Congress about the name change but were unsuccessful in having the name reverted. Today, the stop bears its original name, "Engle."

Elephant Butte Dam

Another name proposed for the dam and used in at least one publication was "Woodrow Wilson Dam," after the former U.S. president.

Elephant Butte Dam

The proposed name for the reservoir was "Lake B.M. Hall," after Bureau of Reclamation engineer Benjamin Mortimer Hall, who championed the project.

History

Drought and floods

Like for many other rivers of the American Southwest, runoff in the Rio Grande basin is limited and varies widely from year to year and alternates between devastating droughts and destructive floods. In the 1880s, farmers in the region began to complain that they were not receiving a fair appropriation of river water. By the 1890s, water use in the upper basin was so great that the river's flow near El Paso, Texas, had been reduced to "a trickle in dry summers."

To resolve those problems, plans were drafted up for a large storage dam at Elephant Butte, about downstream of Albuquerque, New Mexico. The first to propose a dam for the area were Peter E. Kern, E.V. Berrien, John Campbell, R.M. Loomis and Edward Roberts. They had camped in the area where the dam is now; although Kern encouraged the others to consider building a dam there, its construction was delayed by legal battles relating to the final site and to water rights.

A site lower far downriver, at the El Paso narrows (the former site of the ASARCO plant at Smeltertown), was considered for a dam, but it would have flooded much of the lower Mesilla Valley and interfered with railway and other transportation. The site at Elephant Butte was chosen for those reasons and for its mountainous location, which created a natural basin for a reservoir. The river at the site was "too thin to plow, too thick to drink." The proposed dam featured in the 1906 Boundary Waters Convention between the United States and Mexico, which also specified how much water should be delivered to Mexico after the dam's completion.

A private dam project backed by British investors was in the works in 1894 just upstream from the dam site and also by the U.S. Department of the Interior. It was eventually blocked by the U.S. Secretary of State "on basis of a technicality that the Rio Grande was arguably a navigable river and permission from the War Department was also needed." Although delayed by legal issues, the injunction against building the dam was lifted in 1897. However, the project failed to proceed, and the investors lost their rights to build the private dam in 1903.

The Victorio Land and Cattle Co. owned about three fourths of the site and in 1909 demanded the government pay $17.83 per acre, instead of the substantially-lower offer of $1.83 per acre. A lengthy court battle ensued, and the US government condemned 24,730 acres of the company's land and settled on a price of $6.66 per acre for the remaining 30,000 acres.

Construction

The U.S. Congress passed the Newlands Reclamation Act in 1902, authorizing the Rio Grande Project to provide power and irrigation to south-central New Mexico and western Texas as a Bureau of Reclamation undertaking. For the next two years, surveyors and engineers undertook a comprehensive feasibility study for the project's dams and reservoirs. Construction of the dam was authorized on February 25, 1905, and began in 1911.