MX3000 is an electric train used on Oslo Metro in Oslo, Norway. The multiple units are produced by Siemens Mobility, who started serial delivery in 2007. Seventy-eight three-car units were ordered by Sporveien, and five by Akershus County Municipality. They replaced the older T1000 and T1300 stock that was used on the Oslo Metro since 1966. By 2010, the last T1000 and T1300 trains had been retired and replaced by 83 three-car units. 32 additional sets were ordered, and the final train set was delivered in 2014, increasing the fleet to 115 units.

The trains are built as 3-car units, though they often operate 2 coupled units in regular service. The units are long, and weigh empty. They have twelve traction motors, allowing speeds of . Seated capacity is 138 seats, and total capacity is 493 passengers. The first series of 33 units were ordered in 2003, followed by an additional order for 30 in 2005, 15 in 2008, and 32 in December 2010. Financed by Oslo Package 2, each unit cost about .

OS MX3000

History

In 1966, the Oslo Metro opened as an upgrade of two existing suburban tramways, the Østensjø- and Lambertseter Lines (Lines 3 and 4). By 1970, the system was supplemented by the Grorud- and Furuset Lines. They only operated to the eastern suburbs. In 1987, the system was expanded to connect to the western network, that remained a suburban tramway with overhead wires, two-car platforms and an inferior signaling system. In 1993, the Sognsvann Line was converted to metro standard, with the Røa Line following two years later. When the order for the MX3000 trains was placed, the Kolsås- and Holmenkoll Lines still used overhead wires, and would not be able to use the new stock. Both systems were at the time being considered for conversion to light rail systems, that would connect to the Lilleaker- and Ullevål Hageby Line, respectively.

OS MX3000

The old fleet of T1000 and T1300 consisted of 195 cars in eight series. The T1000 was the original series delivered between 1966 and 1978, while the T1300 was a later adoption built until 1987. The T1000 series had only a third rail shoe, while the T1300 also had a pantograph, and could be used on the Kolsås- and Holmenkoll Lines. In 1995, six two-car T2000 units were delivered for the Holmenkoll Line. They were, at the time, proposed as a possible replacement for all the T1000 and T1300 stock, but were prone to technical problems. They featured both third rail shoes and pantographs.

OS MX3000

In 1996, the work to establish a financing package for new investments in public transport in Akershus and Oslo started. It was passed, in 2001, by the city and county councils, as well as the Norwegian Parliament. Oslo Package 2 allowed municipal and state grants to be supplemented by increased fare and toll road revenue to finance, among other things, new trains for the metro. The initial order by Oslo Sporveier was for 33 units (or 99 cars), and was approved by the board on 28 June 2003. The initial order cost NOK 1.6 billion, and included options for further orders. Five other manufactures had been rejected during the procurement process. Combined with other investments in the network, the new trains will allow faster travel times on the metro.

In 2005, the city council voted to replace all existing T1000 and T1300 stock with the MX3000, increasing the quantity by another 30 units. With the second order, the price had increased to NOK 2.5 billion. Two test units were delivered in October 2005, and the serial production started in April 2006, with the first deliveries in April 2007. With the delivery of the new trains, Oslo Sporveier received criticism that they had been disloyal to the old red color of the metro, and that they did not follow up on their former design concept from the 1960s through the 80s. During the first 30 days, two errors occurred: one in the closing mechanism of the doors, and one with a switch in the cab that was not water tight. However, it turned out that Oslo Sporveier had not been accurate enough in specifying the energy consumption of the trains, and the rectifiers on parts of the line needed to be upgraded to supply sufficient power to the trains. During 2007, there were four incidents where the trains were not able to brake at stations. The worst incident occurred when a train slid from Blindern down to Majorstuen.