The Frigg UK System is a natural gas transportation system from the North Sea gas fields to St. Fergus near Peterhead in Scotland. It transports natural gas from the Alwyn North, Dunbar, Ellon, Grant, Nuggets, Frigg, Bruce, Ross, Captain, Buzzard, Tartan, Piper, Chanter, Galley, Hamish, Highlander, Ivanhoe, MacCulloch, Petronella, Saltire, and Rob Roy, fields.

History

Construction of the main pipeline, the Frigg UK pipeline, started in 1974 and was completed in 1977. It was built to transport natural gas from the Frigg gas field to the United Kingdom. Because of technical limitations, it was decided to build two parallel pipelines, one (the Frigg UK pipeline) by the United Kingdom and one by Norway (former Frigg Norwegian Pipeline, now Vesterled). Even in British waters, until 1998 both pipelines were in Norwegian jurisdiction.

Frigg UK System

Technical description

The system comprises the Frigg UK pipeline, Alwyn pipeline, other connection lines, and processing facilities at the St Fergus Gas Terminal. The long Alwyn pipeline with diameter of connects Alwyn North Field with the Frigg Field's TP1 bypass spool. From the TP1 the long original Frigg UK Pipeline with diameter of runs to the St Fergus Gas Terminal, alongside of the Vesterled pipeline. An diameter pipeline connects Tartan and Piper fields with the Frigg UK Pipeline at the MCP-01 platform, northeast of Aberdeen. The Frigg UK System is operated by Total E&P UK Ltd.

Frigg UK System

References

Buildings and structures completed in 1977

Economy of Scotland

Energy infrastructure completed in 1977

Natural gas pipelines in the United Kingdom

North Sea energy

Norway–United Kingdom relations

TotalEnergies

Pipelines under the North Sea

1977 establishments in Scotland

Frigg UK System