The Dighton and Somerset Railroad, currently referred to as the Dean Street Industrial Track, is a railroad that ran between Fall River and Braintree, Massachusetts. It opened in 1866; from the 1890s to the 1930s and again in the late 1950s, it was the primary rail route from Boston to the South Coast. Passenger service ended in stages with the final regular service in 1958, though freight service on two short segments continues into the 21st century. MBTA Commuter Rail service is proposed to be extended onto the northern part of the line around 2030 as part of the South Coast Rail project.
History
Old Colony era
In 1863, the Dighton and Somerset Railroad was chartered to build a new line from Taunton to Somerset (across the river from Fall River) via Dighton. In 1864, the charter was amended to allow extension north to Randolph or Braintree. This represented a significant threat to the Old Colony and Newport Railway (OC&N) and its existing route to Fall River; the OC&N acquired the new railroad in 1865. The OC&N was interested in having a route to the growing industrial city of Taunton, which was served by its competitor Boston and Providence Railroad (B&P) via the Taunton Branch Railroad. The line was opened in September 1866; it used part of the 1855-built Easton Branch Railroad (acquired from the B&P at that time) south of Stoughton Junction, which also gave the OC&N a new freight connection to Stoughton. The new railroad passed east of downtown Taunton with a station at Dean Street and crossed the tracks of the New Bedford and Taunton Railroad at Weir Junction near Weir Village. The line then ran along the west bank of the Taunton River through its namesake towns of Dighton and Somerset before crossing the river over a man-made causeway and bridge at the north end of Fall River.
The OC&N became the Old Colony Railroad in 1872. Around 1882, the Old Colony began diverting trains on a new branch from Raynham to Whittenton Junction (the Whittenton Branch, which allowed all service to stop at the new Taunton Central Station. In 1888, the Old Colony acquired the B&P; the Easton Branch was upgraded between Stoughton and Stoughton Junction to allow use of the Dighton and Somerset as a through route to the South Coast via the B&P mainline rather than the Old Colony mainline. In 1893, the Old Colony Railroad was itself leased to The New York, New Haven and Hartford Railroad. The New Haven further consolidated service to Taunton Central; by 1895, the Fall River Line's Boat Train was the only passenger service between Raynham and Weir Junction. All passenger service through Dean Street ended in 1897.
In 1906, the Mount Hope Finishing Company built a freight branch from the Dighton and Somerset mainline to its textile plant in North Dighton. The branch was taken over by the New Haven three years later. The branch was abandoned when the plant closed in 1951, but most of the rails between Somerset Avenue and Warner Boulevard remain in place. The Taunton River drawbridge was rebuilt in the late 1910s.
Decline
The New Haven began shifting through service onto the Dighton and Somerset in the 1890s, and was the New Haven's primary Boston-Fall River route by the late 1910s. Around 1927, all through trains were routed via Stoughton instead of the original route through Braintree. Passenger service ended between Randolph and Stoughton Junction around 1927, and from Braintree Highlands to Randolph in 1938. In 1932, all passenger service and through freight service ended south of Weir Junction when the drawbridge over the Taunton River was disabled after a ship hit another bridge carrying power cables. The line was taken out of service between Dean Street and Raynham that year and formally abandoned in 1937, along with the section south of Dighton. The New Haven received ICC permission to abandon the section between Randolph and Stoughton Junction on June 11, 1937; it was abandoned in 1938.
Also in 1937, South Coast service was rerouted via Mansfield; shuttles ran from Canton Junction to North Easton and Whittendon, with a small amount of through service to Boston. During the 1940s, service between Whittendon and North Easton was cut for several years, leaving just the North Easton shuttles. These too were cut in 1950, but New Bedford service was rerouted via Stoughton to maintain minimal service on the branch. South Coast service alternated between the Stoughton and Mansfield routes until 1955, when a grade separation project in Mansfield forced all service to the Stoughton route.