The BMT Nassau Street Line is a rapid transit line of the B Division of the New York City Subway system in Manhattan. At its northern end, the line is a westward continuation of the BMT Jamaica Line in Brooklyn after the Jamaica Line crosses the Williamsburg Bridge into Manhattan. The Nassau Street Line continues south to a junction with the BMT Broadway Line just before the Montague Street Tunnel, after which the line reenters Brooklyn. Although the tracks merge into the Broadway Line south of Broad Street, there has been no regular service south of the Broad Street station since June 25, 2010. While the line is officially recognized as the Nassau Street Line, it only serves one station on Nassau Street: Fulton Street.
The line is served at all times by the J train. The Z provides supplemental rush hour service, operating in the peak direction. The M service has historically served the Nassau Street Line, but since 2010, the M has been rerouted via the Chrystie Street Connection to run on the IND Sixth Avenue Line, as a replacement for the V, which was discontinued due to financial shortfalls. The M continues to serve one Nassau Street Line station: the Essex Street station.
Service
The following services use part or all of the BMT Nassau Street Line. The trunk line's bullets are colored :
History
Planning, construction, and first section
After the original lines of the Interborough Rapid Transit Company (IRT) opened, the city began planning new lines. Two of these were extensions of that system, to Downtown Brooklyn and Van Cortlandt Park, but the other two – the Centre Street Loop subway (or Brooklyn Loop subway) and Fourth Avenue subway (in Brooklyn) – were separate lines for which construction had not progressed as far. The Centre Street Loop, approved on January 25, 1907 as a four-track line (earlier proposed as two tracks), was to connect the Brooklyn Bridge, Manhattan Bridge, and Williamsburg Bridge via Centre Street, Canal Street, and Delancey Street. An extension south from the Brooklyn Bridge under William Street to Wall Street was also part of the plan, as were several loops towards the Hudson River and a loop connecting the bridges through Brooklyn. Trains coming from Brooklyn via the Manhattan and Williamsburg Bridges would be able to head back to that borough via the Brooklyn Bridge as well as the Montague Street Tunnel at the south end of the Centre Street Loop, and vice versa. All trains would pass through a large central station with four tracks and five platforms at Chambers Street, just north of the Brooklyn Bridge.
Construction contracts for the main line in Manhattan were awarded in early 1907, though the city had not yet selected an operator for the line. The work was divided into five sections: two under Centre Street and three under other streets or buildings. The city began receiving bids for the sections under Centre Street in March 1907. The city received bids for the sections between Centre Street and Bowery (under Kenmare Street), between Bowery and Norfolk Street (under Delancey Street), and between Pearl Street and Park Row (under the Manhattan Municipal Building) that June. The line was assigned to a proposed Tri-borough system in early 1908 and to the Brooklyn Rapid Transit Company (BRT) in the Dual Contracts, adopted on March 4, 1913. Unlike previous subway contracts that the city government had issued, the BRT was responsible only for constructing the Centre Street Loop and installing equipment, not for operating the loop. As a result, although the loop was almost completed by late 1908, there was no operator for the route at the time. Furthermore, the BRT did not originally want to operate the loop.
The BRT began operating through a short piece of subway, coming off the Williamsburg Bridge under Delancey Street to Essex Street, on September 16, 1908. The BRT tunnel under Centre Street was completed by 1910, except for the section under the Municipal Building, which contained the incomplete Chambers Street station. The tunnel remained unused for several years. In March 1913, the Public Service Commission authorized the BRT to lay tracks, install signals, and operate the loop. The Centre Street Loop was opened to Chambers Street on August 4, 1913, with temporary operation at first on the two west tracks. The south tracks on the Manhattan Bridge, also running into Chambers Street, were placed in service on June 22, 1915.