Las Vegas Ballpark is a baseball stadium in the Summerlin South region of Las Vegas, Nevada, United States. It is the home field for the Las Vegas Aviators of the Pacific Coast League, who are currently affiliated with the Oakland Athletics. The stadium, along with its primary tenant, is owned by the Howard Hughes Corporation. Las Vegas Ballpark is located in Downtown Summerlin near the intersection of South Pavilion Center Drive and Summerlin Center Drive next to City National Arena and across the street from the Downtown Summerlin shopping center. Construction of the $150 million stadium began in 2018 and was completed in time for the Aviators' 2019 season. It replaced the team's previous home at Cashman Field, where the Aviators had resided since 1983 as the Stars and 51s, respectively.

Although built for Triple-A baseball, the stadium was designed in such a manner as to be usable on a temporary basis for Major League Baseball. As of 2023, the Oakland Athletics are actively negotiating to relocate to Las Vegas possibly as soon as the 2025 MLB season, and should they move, they are potentially expected to play at Las Vegas Ballpark until their new 33,000-seat ballpark on the Las Vegas Strip is complete by 2028 contingent on approval from the MLB Players Association (MLBPA).

Las Vegas Ballpark

History

Background

The decision to build a new stadium for the team, then known as the 51s, came on the back of many issues both the 51s and Minor League Baseball had with the team's previous stadium, Cashman Field. Considered state-of-the-art when it opened in 1983, it had fallen far behind the times. Players and staff criticized the facility noting poor conditions in the playing surface, bullpens, and clubhouse. The weight room was smaller when compared to other Triple-A stadiums, with infielder Ty Kelly calling it "basically just a room... not an actual weight room". The batting cage was also a point of concern for the players; it was a single lane and only accessible by walking out of the clubhouse to the parking lot. Johnny Monell described the cage as making him feel like he was "back in high school again," not one level below the major leagues. During a 51s game on August 22, 2015, the stadium sewage system backed up, causing raw sewage to flow into the dugouts. The smell was so strong that players were forced to watch the rest of the game from chairs on the field. Team president and chief operating officer Don Logan said, "It's disappointing that Vegas has the worst facility in our league when we have such a great town with the greatest hotels, the greatest dining, the greatest shopping. It's not becoming of this community to have a place like this."

Las Vegas Ballpark

Pacific Coast League commissioner Branch Barrett Rickey expressed his concerns about the feasibility of the continuous usage of Cashman Field as a Triple-A ballpark. In a letter to the Las Vegas Convention and Visitors Authority which owned and operated the facility, he wrote that Cashman Field had long since reached the end of its useful life, and a number of MLB teams had opted to place their Triple-A teams "in far less appropriate markets" than Las Vegas. He added that Cashman Field needed "many tens of millions of dollars" to keep it at something approaching Triple-A standards, and even those would not have been enough to make it "an optimal long-term solution" as a Triple-A venue. For much of the time since the San Diego Padres ended their 18-year affiliation with what was then known as the Las Vegas Stars in 2000, Las Vegas had been considered an affiliate of last resort for most MLB teams, something Las Vegas Ballpark sought to fix.

Las Vegas Ballpark

Approval and groundbreaking

In April 2013, the team was purchased by Summerlin Las Vegas Baseball Club LLC, a joint venture of Howard Hughes Corp. and Play Ball Owners Group, including investors Steve Mack, Bart Wear and Chris Kaempfer, with intentions of moving it to a new stadium in Summerlin. In October 2017, the Las Vegas Convention and Visitors Authority approved a 20-year, $80 million naming rights agreement to help pay for the 10,000-seat ballpark.

The official groundbreaking was held on February 13, 2018. By April 2018, excavation was 85 percent complete with nearby grading for parking lots about 90 percent complete. By June 2018, it was on schedule to be completed before the 2019 season.