Lower Mettur Hydroelectric Project is a hydropower generation project in the South Indian state of Tamil Nadu. It is a 120MW power generation project constructed across the Kaveri River. The project area is in the downstream of Mettur Dam, hence it derives the name. This project consists of four power plants which are located between Mettur in Salem district and Bhavani, Erode. This power generation project is owned by Government of Tamil Nadu and operated by TANGEDCO.

Power Plants

This project involves a series of power plants each with Barrage type Dam, constructed across the River Kaveri to divert the stream to where the power house is located. It consists of four Barrages each of which receives water current in a serial manner. Power Plant-I : Named as Chekkanur Barrage with Hydroelectric power generation capacity of 30MW. This Barrage has one powerhouse and two turbine units, each of 15MW production capacity. Power Plant-II : Named as Nerinjipettai Barrage with Hydroelectric power generation capacity of 30MW. This Barrage has one powerhouse on the western banks of the river and two turbines, each of 15MW Capacity. Power Plant-III : Named as Kuthiraikkalmedu Barrage with Hydroelectric power generation capacity of 30MW. This Barrage has one powerhouse on the western banks of the river and two turbines, each of 15MW Capacity. Power Plant-IV : Named as Urachikottai Barrage with Hydroelectric power generation capacity of 30MW. This Barrage has one powerhouse on the western banks of the river and two turbines, each of 15MW Capacity.

Lower Mettur Hydroelectric Project

References

Erode district

Salem district

Hydroelectric power stations in Tamil Nadu

1988 establishments in Tamil Nadu

Energy infrastructure completed in 1988

20th-century architecture in India

Lower Mettur Hydroelectric Project