Chenderoh Power Station or Chenderoh Dam was the first major hydroelectric dam and power station in Malaysia. It was preceded by two earlier booiis on Malaya's rivers; the Ulu Gombak station of 800kw in Selangor (1905) that was used to provide Kuala Lumpur's first electricity, and the Sungei Besi Tin Mines Ltd scheme at Ulu Langat that was purchased by FMS Electrical Department in 1929. The dam is located at Chenderoh Lake, Kuala Kangsar District, Perak. It was constructed by Perak River Hydro-Electric Power Company Ltd and completed between 1929 and 1930. The scheme was designed by consulting engineers Rendel, Palmer & Tritton of London and Vattenbyggnadsbyran (VBB) of Stockholm, Sweden. The architect was Osvald Almqvist.

The Chenderoh plant was constructed in tandem with a steam power station at Malim Nawar, 65 km south of Chenderoh, that was commissioned in 1928. Between them the stations supplied power to Kinta Valley's tin mining industry and associated settlements.

Chenderoh Power Station

The station is operated by Tenaga Nasional.

Chenderoh Power Station

Design

The power station is a hydroelectric power station, using 4 turbines of 10.7 MW and one of 8.4 MW, totaling 40.5 MW installed capacity.

Chenderoh Power Station

Technical specifications

The permanent dam components are: Main Dam Crest elevation is above sea level (ASL), maximum flood level is , operating levels maximum 45 m. Reservoir area at ASL is , and with a catchment area of x,000 km2. Storage volume is . Power Intake Structure - 5 bays. Spillway- gated concrete weir with chute and flip bucket. Power Tunnels - 5 tunnels. Powerhouse powerhouse with 5 penstocks to powertrains comprising 5 turbines of 10.7MW each and one of 8.4 MW, 5 generators of 15MVA each and 4 transformers of 15MVA each.