PT Kereta Cepat Indonesia China (, abbreviated as KCIC) is an Indonesian transportation company that operates the Indonesian high-speed rail network built on the Jakarta–Bandung route in the Parahyangan megapolitan area.

The company is a joint venture between PT Pilar Sinergi BUMN Indonesia (PSBI) by 60% and Chinese state-owned consortium company Beijing Yawan HSR Co. Ltd. by 40%. PSBI itself is a joint venture of Indonesian state-owned enterprises consists of Kereta Api Indonesia (51.37%), Wijaya Karya (39.12%), Jasa Marga (8.3%), and Perkebunan Nusantara VIII (1.21%). Beijing Yawan HSR Co. Ltd. is also a joint venture, formed by Chinese state-owned enterprises including China Railway Group Limited (42,88%), Sinohydro (30%), CRRC (12%), China Railway Signal & Communication (10.12%), and China Railway International (5%).

Kereta Cepat Indonesia China

History

China's bid and the establishment of KCIC

In April 2015, the People's Republic of China competed with Japan when the two countries offered their high-speed trains to Indonesia. This competition, according to The Jakarta Post, is part of a geopolitical and economic rivalry between the two countries to gain strategic influence in the Asia-Pacific region. After the project was nearly canceled at the end of September, Indonesia chose China as the winner of this 75 trillion rupiah (US$5 billion) project.

Kereta Cepat Indonesia China

On 2 October 2015, PT Pilar Sinergi BUMN Indonesia (PSBI) was formed as a consortium of four state-owned enterprises involved in the high-speed train development process namely: Kereta Api Indonesia, Wijaya Karya, PTPN VIII, and Jasa Marga. On 6 October, the formation of the consortium was reported to the Financial Services Authority, and President Joko Widodo passed Presidential Regulation (Perpres) No. 107 of 2015 concerning the Acceleration of Implementation of Fast Train Infrastructure and Facilities between Jakarta and Bandung. The company will invest in a joint venture.

Kereta Cepat Indonesia China

The joint venture is called PT Kereta Api Indonesia China, with 60% ownership of PSBI and 40% of China Railway International Company Limited. The company was formed on 16 October 2015 and is planned to prioritise commercialisation, not burden the state budget, and promote synergies between businesses. Responding to this new partnership, Japanese Prime Minister Yoshihide Suga stated he "deeply regretted" and "difficult to understand" Indonesia's choice. However, BUMN Minister Rini Soemarno said that China's financial structure was considered more profitable because China's proposal did not require guarantees and funding from the Indonesian government.

Construction

To start construction, Joko Widodo (Jokowi) passed Presidential Regulation no. 3 of 2016 as a National Strategic Project. On 21 January 2016, Jokowi laid the first stone for construction in the Walini Tea Plantation area owned by PTPN VIII. The estimated financing for the construction process reaches IDR 70 trillion.

In 2017, in the City of Beijing, PRC, a Facility Agreement for Infrastructure Financing and Fast Train Facilities was signed, which was personally witnessed by President Jokowi and PRC President Xi Jinping. Budi Karya Sumadi as the Minister of Transportation reminded construction contractor companies to immediately speed up the construction process. According to him, land acquisition is a problem of hampering infrastructure development, and he does not require that land acquisition be completed 100%. Nevertheless, land acquisition is still a prerequisite that must be met so that the loan provided by the China Development Bank can be disbursed immediately.

The established route is the Jakarta-Bandung route of 142.3 km, and is supported by four stations namely Halim, Karawang, Walini and Tegalluar. Each station will be equipped with facilities to support transit-oriented development (TOD) around the station. Regarding the plan for this new station, Walini will be projected as a new planned city that will become a buffer for the Greater Bandung area. This project is projected to absorb 39,000 workers during the construction process, 20,000 workers during the TOD construction process, and 28,000 workers after operation. To support operations, KCIC will present 11 sets of fast trains with 8 railway carriage per trains.