The new supply from Gunpowder River is brought through a 12-foot conduit 7 miles in length, having a capacity of 170 million gallons, to Montebello Reservoir, of 80 acres water surface, and 163 feet above tide. From here it is conveyed partly in tunnel and in open cut 5,391 feet to Lake Clifton, which has a water surface of 30¼ acres and elevation 163 feet above tide, and 31 feet deep. Provisions are made for six 40-inch mains; two now being used. The new system cost $4,704,260.83, and was formerly inaugurated in October, 1881. The statistics for 1880 are: population, 332,190; miles of pipe, 277; water takers, 49,000; meters, 524; outstanding bonds amounting to 9 million dollars.

_Buffalo_ takes its supply from a pier in Niagara River, and is conducted through a tunnel 22½ feet below the river bottom. The system is pumping and reservoir distribution with Holly plan for fire purposes and supply of higher levels. At the pumping station there are two Worthingtons--one of 10 million and the other of 15 million capacity--and a condensing beam engine of 8 million capacity. A third Worthington is now in course of erection. There are three Holly pumps, one of 1½ millions; one of 2½ millions; and one of 6 millions capacity, which take their supply from the face main 20 feet below the reservoir, and pump directly into the mains. The statistics for 1880 are: population, 155,137; miles of pipe, 102; daily consumption, 16½ million gallons; water-takers, 9,099. The original cost of the works was $400,000. Present value 3 million dollars, outstanding bonds $2,950,000.

History of the Water Supply of the World — Part 59

_Washington_ is supplied from the Potomac River by diverting the waters at Great Falls 17 miles above the city, by a dam of cut masonry with rip-rap backing. Its top is 148 feet above tide level at Washington. The water is conducted through a brick aqueduct 9 feet in diameter, with a grade of 0.75 feet per mile. The reservoir at Powder Mill Branch (made by damming the stream), has a water surface of 50 acres, with a capacity of 176 million gallons. The expectation that the Potomac water, which is frequently very muddy, would have time to settle in this reservoir before being drawn from its outlet was not realized in consequence of the turbidity of drainage water collected by the reservoir itself; a connecting conduit was therefore built in 1864 to supply direct from Potomac River, during freshets, in Powder Mill Branch.

History of the Water Supply of the World — Part 59