The London and Greenwich Railway (L&GR) was opened in London between 1836 and 1838. It was the first steam railway in the capital, the first to be built specifically for passengers, and the first entirely elevated railway.

Origins

The idea for the line came from Colonel George Thomas Landmann, until 1824 a Royal Engineer, and George Walter, and the company was floated at a meeting on 25 November 1831. It would run from close to London Bridge, convenient for journeys to the City. It would be some long, on a viaduct of 878 brick arches, some of them skew (see London Bridge-Greenwich Railway Viaduct), to avoid level crossings over the many streets which were already appearing in the south of London. Landmann planned to rent the arches out as workshops. The intention had been to descend to ground level after the Grand Surrey Canal but this was opposed by Parliament.

London and Greenwich Railway

The first Act of Parliament was obtained in 1833 for a line from Tooley Street (now London Bridge) to London Street, Greenwich.

London and Greenwich Railway

The ultimate intention was to reach Dover and there was much talk of a London to Gravesend extension from Greenwich. A scheme was presented to Parliament in 1836 but five others were competing and the bill failed on its second reading.

London and Greenwich Railway

Construction

The line ran parallel with Tooley Street, crossing Blue Anchor Road, Corbetts Lane and the Grand Surrey Canal. From there it curved towards the first station, at Deptford High Street, and thence to Greenwich. The contractor was Hugh McIntosh.

The subsoil was a blackish peat, which gave considerable problems, and Landmann pioneered the use of concrete to reinforce the foundations. Even so, several of the piers near to Corbetts Lane moved four or five inches (100 - 125 mm) out of the perpendicular and on 18 January 1836 two arches close to Tooley Street collapsed. Elsewhere, iron ties were used to prevent lateral spread in the brickwork. In 1840 many of the arches were improved by laying of concrete above them, with a layer of asphalt.

Between Deptford and Greenwich the River Ravensbourne was crossed at Deptford Creek by a balanced bridge to allow masted vessels to pass. Eight men operated it, but possibly because of trouble with the foundations it was unreliable. It was replaced in 1884 and again in 1963.

Originally the line had single parallel tracks of Stephenson gauge , fixed to stone blocks or sleepers. By 1840 there was a mixture of bridge rails, single parallel and double parallel rails (see Rail profile). The original rails caused excessive noise, and damage to structure and rolling stock. Bridge rails were used on the viaduct between Deptford and Greenwich initially, laid on longitudinal timbers with cross sleepers at four-foot intervals. At this time, new double parallel rails of 78 lb. to the yard were laid for a quarter of mile (400 m) at Deptford on timber sleepers, presumably as an experiment. The concrete underlay was replaced with gravel ballast of thickness.

Opening

The first section, between Spa Road and Deptford, opened on 8 February 1836: demonstration trains had been running from mid-1835 including Corbett's Lane Temp Station. These were suspended for a while after a derailment in November, but resumed the following year, with rumours circulating that trains had reached . On the Whit Monday following the official opening, the line carried around 13,000 passengers. There was a fatal accident on 7 March, when Daniel Holmes was run over and a train collided with some carriages.

In 1837, The Gentleman's Magazine celebrated the railway project saying:

The line reached Bermondsey Street in October, and London Bridge on 14 December 1836 (Spa Road was no longer used as a stop at this time). At the other end, the line reached a temporary station at Church Row in Greenwich on 24 December 1838, having been delayed by problems with the Deptford Creek lift bridge. The present Greenwich station opened on 12 April 1840.