RapidRide is a network of limited-stop bus routes with some bus rapid transit features in King County, Washington, operated by King County Metro. The network consists of seven routes totaling that carried riders on approximately 64,860 trips on an average weekday in 2016, comprising about 17 percent of King County Metro's total daily ridership.

RapidRide lines are faster than typical local bus routes because they service fewer stops (on average, 40% fewer than the routes they replaced), make extensive use of bus priority to preempt traffic lights, and on some lines, use special lanes to bypass traffic. RapidRide lines run no less often than every 10 minutes during peak commuting hours and every 15 minutes on weekends and during most off-peak hours. Most lines (except the B, F and H lines) also have night owl (late night and early morning) service.

RapidRide

History

The creation of the RapidRide network was one of the main elements of King County's "Transit Now" initiative that was proposed in April 2006 and approved by voters in November 2006. Funding for the construction and operation of the lines came from a 0.1% sales tax increase included in Transit Now, contributions from local cities and over $80 million in grants from state and federal agencies. One of the most notable local contributions was from Seattle, which funded traffic signal and roadway improvements with the city's "Bridging the Gap" property tax levy, passed at the same time as Transit Now in November 2006.

RapidRide

Transit Now called for a network of routes that included these bus rapid transit features: High-frequency operation (defined as 10 minutes or less) Faster, more reliable trip times through exclusive, HOV or Business Access and Transit (BAT) travel lanes, and/or priority at intersections through transit signal priority and queue jumps Improved shelter waiting areas with real-time information at major stops Low emission hybrid diesel-electric buses Branded buses and facilities with a unique look and feel

RapidRide

These improvements were to be made on five key travel corridors identified in the initiative: Shoreline/Downtown Seattle via Aurora Avenue North West Seattle/Downtown Seattle via West Seattle Bridge Ballard/Seattle Center/south downtown stadium area via 15th Ave Northwest & West Mercer St with service or frequent connections to Ballard High School and the Ballard business district Federal Way-Tukwila via Pacific Highway South Bellevue-Redmond via Crossroads and Overlake

Planning and construction began shortly after approval of the measure. Along each of the corridors, fiber-optic cable was utilized to enable a Transit Signal Priority system (to synchronize traffic signals with buses), an automated vehicle location system and the features on "tech pylons" to be installed at certain locations.

Every stop along the line received some level of improvement, with the degree of investment determined by the ridership. All stops were enhanced with new concrete, RapidRide signage, and a new bus stop flag featuring route information, a solar-powered area light, and a stop request strobe light, to signal to drivers that a passenger is waiting. Additionally, moderately busy stops received new shelters, benches and trash cans. The busiest stops were improved into "stations" with large shelters and a "tech pylon" with an electronic real-time arrival sign, audible arrival information, a backlit route map, and an ORCA reader for off-board fare payment.

Shortly after the approval of Transit Now, Metro's revenues sales tax revenues saw a steep and prolonged decline. To combat the loss of income Metro underwent a series of efficiency measures, including restructuring routes to reduce operating costs. The RapidRide system was largely shielded from these cuts because federal and state grant funding helped pay for new buses and infrastructure. Also, in many cases, Metro actively restructured its network to shift riders to the new faster, high-capacity RapidRide routes.

The A Line between Federal Way and Tukwila International Boulevard station was the first to begin service on October 2, 2010, leveraging the pre-existing high-occupancy vehicle lanes on Pacific Highway South and International Boulevard (both part of State Route 99). The line replaced Route 174, that mainly operated along the same corridor and complements the nearby Central Link light rail line that opened just months before the A Line. The A Line has terminals at the Tukwila International Boulevard Link station and the Federal Way Transit Center (which is expected to receive Link Light Rail service in the future).