Coventry Very Light Rail (CVLR) is a light rail/tram system proposed to operate in Coventry. The system has been promoted as being the first of its kind in the United Kingdom. When finished, it will also be the first tram network to operate in Coventry since the Second World War.

Plans to establish such a system were first revealed during 2016; development work was headed by the Warwick Manufacturing Group (WMG) and Transport Design International (TDI). It was designed to be substantially cheaper to establish than conventional tramways and light railways, making use of batteries to avoid installing expensive overhead line equipment along much of the route, along with a new, thinner track system that is easier to install and repair. The vehicle is standard UK gauge, so would be compatible with other networks.

Coventry Very Light Rail

During early 2018, WMG started formalising its procurement arrangements with various industrial partners to complete development and produce the vehicle. Construction of the first prototype vehicle has been completed. During 2019, it was announced that the first line of the system was planned to be operational by 2024. Further expansion of the network is intended after this point to cover various commercial, residential, and industrial districts of Coventry, as well as linking up with other transit hubs.

Coventry Very Light Rail

Background

Proposals for Coventry to adopt this technology were first publicly revealed during 2016. The concept for this mass transit system originated from the Warwick Manufacturing Group (WMG), an institution that is closely associated with the University of Warwick; much of the system's early development was performed by the group prior to other entities becoming involved. In January 2018, WMG commenced its procurement process, in which various industry partners were selected to develop and produce aspects of the vehicle. During June 2018, it was announced that WMG had awarded a contract to the Stratford-upon-Avon based transport specialist Transport Design International (TDI). In accordance with this selection, TDI has been assigned overall responsibility for the design and manufacture of the vehicles, working in close cooperation with WMG to do so.

Coventry Very Light Rail

Further elements of the system have been contracted to numerous third parties. Tikab & Arogus will perform both the design and manufacture of both the bogies and the control systems. Transcal is responsible for producing miscellaneous metal fabricated elements, along with the seating and interior fittings. Transport for West Midlands (TfWM) had been appointed to as the lead authority on all operational aspects of the system. That same month, it was suggested that an initial section of the system, running between the railway station and the city centre, could open as early as 2021..

During early 2019, it was announced that development of the system had reached an advanced stage, along with an initial route and launch date. It is reportedly scheduled for the first demonstrator vehicle to be completed by the end of 2023 or the start of 2024, after which it will be subject to a series of tests in advance of its delivery during the following year. Testing will be conducted at the Very Light Rail National Innovation Centre in Castle Hill, Dudley, West Midlands. It has been speculated that early passenger-carrying services could commence as early as 2021 while a full service would follow two or three years later.

Technology

The concept of 'Very Light Rail' (VLR) has been developed as a means of delivering a light rail system at a much lower cost and with much reduced construction times than traditional tramways or light rail systems. This will allow for such systems to be rolled out across smaller towns and cities so they can gain the benefits of a tram system at a considerably more affordable cost. The system had reportedly been engineered for compatibility with the existing West Midlands Metro mass transit network. It has been envisioned that services upon the network could be operated upon a 'turn up and go' frequency at a typical interval of every three to four minutes, rather than using a timetable.