Auburndale station is an MBTA Commuter Rail station in Auburndale, Massachusetts. It serves the Framingham/Worcester Line. It is located next to the Massachusetts Turnpike near Lasell College. The modern station platform, built around 1961, replaced a highly acclaimed 1881 depot building designed by H. H. Richardson. A full renovation of the station for accessibility is planned.
History
Opening
The Boston and Worcester Railroad opened the segment from West Newton to Wellesley Hills in July 1834. A second track was added in 1839, and in 1843 the railroad began offering season fares for around $60, making it one of the first commuter rail systems. Due to the popularity of the other Newton stops, a station at Auburn Dale (soon Auburndale) was opened by the late 1840s. The depot was located on the south side of the tracks in a large open area at the intersection of Auburn Street, Lexington Street, and several other roads. In 1867, the Boston & Worcester joined with the Western Railroad to become the Boston & Albany Railroad.
H.H. Richardson depot
Beginning in 1881, the Boston & Albany began a massive improvement program that included the building of over 30 new stations along its main line as well as the Highland branch, which it bought in 1883. Acclaimed architect H. H. Richardson was hired to design several stations (eventually nine) along the line, starting with Auburndale. Although not as grand as some of his other B&A works like Framingham and Palmer stations, the Auburndale station's design was highly praised. Henry-Russell Hitchcock called it "the best he ever built" in The Architecture of H.H. Richardson and His Time, and a 1904 architecture journal claimed that Richardson's depots at Auburndale and Chestnut Hill "created a new standard of way-station construction."
The 1881 station was constructed in Richardson's signature Richardsonian Romanesque style, with influence from Japanese architecture as well as Romanesque Revival architecture. The one-story building was built from "red and light grey granite", with "heavy masonry and dominant roof." The interior was divided into a pair of waiting rooms for men and women, with a ticket counter between. The platform was shaded by a canopy, which wrapped around the east end of the building into a porte-cochère. Construction, by the Norcross Brothers firm, cost $16,290. As with a number of other stations on the line, Frederick Law Olmsted designed the landscaping, which included large trees, shrubs, and Japanese ivy. A replica of the station, still standing, was built by the Buffalo, Rochester and Pittsburgh Railway in 1911 in Orchard Park, New York.
Demolition and modern era
Despite the accolades, H. H. Richardson's depot was torn down in 1961 after 80 years in service. The extension of the Massachusetts Turnpike from Route 128 to downtown Boston involved removing two of the line's four tracks from Auburndale to downtown. The historic stations at Auburndale, , , , and Brighton were demolished; only the Allston depot survived. Auburndale, West Newton, and Newtonville stayed in service, but with extremely diminished facilities – bare asphalt platforms with simple metal shelters. The single side platform provides access to only one of the line's two tracks; passengers use short asphalt strips to access trains on the other track. The 1961-built platform stretches from Woodland Street to Auburn Street, just west of the previous station locations.
Service to West Newton and Auburndale stations was reduced to one daily round trip on January 30, 1981, as part of a series of service cuts due to a budget crisis. Normal service resumed to the two stations on March 16, 1981.
Planned renovations
The bare platform and steep metal stairs make Auburndale station inaccessible. In the future, the station is planned to be rebuilt with a high-level platform and elevators or ramps to street level to meet ADA guidelines. In April 2004, the Boston Regional Metropolitan Planning Organization voted to add $368,000 (funded by a federal earmark) for planning Auburndale renovations to its 2004-2008 spending plan. However, the project was not pursued at that time.
Beginning in 2008, Representative Barney Frank secured $3 million in funding for design of the replacement station. 30% design plans were released in July 2013, at which point construction was estimated to cost $11.5 million. 100% design was completed in January 2017, with construction scheduled for April 2017.