The Kakkad Hydroelectric Power Plant is located near Seethathode, in the Pathanamthitta district of the Indian state of Kerala. It is operated by the Kerala State Electricity Board.

This hydropower plant has a design capacity of 50 MWe. It has 2 turbines, commissioned in 1998 and 1999.

Kakkad Hydro Electric Project

Features

The project is in the second stage of development. The installed capacity is 50 MW (2 x 25MW). This scheme utilizes the tail race water from Sabarigiri power station and water from the Moozhiyar and Velluthode rivers. Two dams store water for the powerhouse. The main reservoir is on the Moozhiyar. The second reservoir is formed by the Veluthodu dam, across the Velluthode river. After generating power, water is released to the Kakkad River. Ullunkal and Karikkayam power stations use this water for power generation and then release it into the Maniyar reservoir for power generation at the Maniyar power station.

Kakkad Hydro Electric Project

Related projects

Kakkad Power House

Upper Moozhiyar Dam

Upper Moozhiyar Spillway Dam

Veluthoda Forebay (Kakkad) Dam

Moolamattom hydro power station

References

External links

http://globalenergyobservatory.org/geoid/43256 This article contains quotations from this source, which is available under a Attribution 3.0 United States (CC BY 3.0 US) license. http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Kakkad_Hydroelectric_Project_JH01238 https://web.archive.org/web/20180419021140/http://india-wris.nrsc.gov.in/wrpinfo/index.php?title=Kakkad_Hep_Power_House_PH01245 http://www.kseb.in/index.php?option=com_content&view=article&id=70&Itemid=717&lang=en https://www.youtube.com/watch?v=15gYl0vntP4

Kakkad Hydro Electric Project

Hydroelectric power stations in Kerala

Pamba River

Buildings and structures in Pathanamthitta district