Intercity (IC) is the second-highest train classification in Germany, after the Intercity Express (ICE). Intercity services are loco-hauled express train services, usually over long-distances. There are Intercity routes throughout Germany, and routes generally operate with a two-hour frequency, with multiple routes giving a more frequent service on core routes. Intercity services are operated by the DB Fernverkehr sector of Deutsche Bahn.

The Intercity name was introduced in Germany in 1971, replacing the old F-Zug category, and was the top category of train in Germany until the introduction of the ICEs in the early 1990s. With the proliferation of ICE services, the role of IC trains has diminished slightly, and they have taken on the character of many former InterRegio trains. Nonetheless, Intercity trains still offer a very high standard of speed and comfort – all services convey first class accommodation, and most include catering – usually a Bistro Cafe, but some services include a restaurant. A number of Intercity services serve destinations outside Germany; most of these are under the EuroCity classification.

Intercity (Deutsche Bahn)

History

Inception

The idea for Intercity services on the Deutsche Bundesbahn network was first proposed in 1967, inspired by the success of British Rail's InterCity brand. After some planning, the proposal was approved in 1969, and the services were finally introduced in September 1971, after some delays in delivery of new coaching stock. The original network consisted of four lines, operating every two hours, and connecting the largest cities in West Germany. At this time, Intercity trains were first-class only. The original lines were:

Intercity (Deutsche Bahn)

line 1 (red): Hamburg-Altona – Bremen – Münster (Westf) – Dortmund – Essen – Duisburg – Düsseldorf – Cologne – Bonn – Koblenz – Mainz – Mannheim – Heidelberg – Stuttgart – Ulm – Augsburg – Munich line 2 (blue): Hannover – Bielefeld – Hamm – Dortmund – Hagen – Wuppertal-Elberfeld (– Solingen-Ohligs) – Cologne – Bonn – Koblenz – Wiesbaden – Frankfurt (Main) – Würzburg – Nuremberg – Augsburg – Munich line 3 (green): Hamburg-Altona – Hannover – Göttingen – Fulda – Frankfurt (Main) – Mannheim – Karlsruhe – Freiburg (Breisgau) – Basel line 4 (gold): Bremen – Hannover – Göttingen – Bebra – Fulda – Würzburg (– Ingolstadt) – Munich

Intercity (Deutsche Bahn)

Gradually, the Intercity network started to expand, and with the introduction of the Class 103 locomotives, 200 km/h running was possible. Services were increased in frequency to hourly, and second class accommodation was provided – in 1979 this was promoted with the slogan "every hour, every class".

Additionally, there is also another new line 5, running from Dortmund to Munich. It was opened since 2 May 1985.

line 1 (red): Hamburg-Altona – Bremen – Osnabrück – Münster (Westf) – Dortmund – Bochum – Essen – Duisburg – Düsseldorf – Köln – Bonn – Koblenz – Wiesbaden – Frankfurt (Main) line 2 (brown): Hannover – Bielefeld – Hamm – Dortmund – Essen – Duisburg – Düsseldorf – Cologne – Bonn – Koblenz – Mainz – Mannheim – Heidelberg – Stuttgart – Ulm – Augsburg – Munich line 3 (green): Hamburg-Altona – Hannover – Göttingen – Fulda – Frankfurt (Main) – Mannheim – Karlsruhe – Freiburg (Breisgau) – Basel (– Switzerland) line 4 (gold): Hamburg-Altona – Hannover – Göttingen – Bebra – Fulda – Würzburg – Augsburg – München line 4a (grey): Oldenburg or Bremerhaven – Bremen – Hannover line 5 (blue): Dortmund – Hagen – Wuppertal-Elberfeld (– Solingen-Ohligs) – Cologne – Bonn – Koblenz – Mainz – Frankfurt Airport – Frankfurt (Main) (– Aschaffenburg) – Würzburg – Nuremberg – Augsburg – Munich

The InterCity for 3a is also part of the TransEuropExpress:

line 3a: Amsterdam – Utrecht – Oberhausen – Duisburg – Düsseldorf – Köln – Bonn – Koblenz – Mainz – (Mannheim – Karlsruhe – Freiburg (Breisgau) – Basel) or (Mannheim – Heidelberg – Stuttgart – Ulm – Augsburg – Munich – Salzburg) or (Frankfurt Airport – Frankfurt (Main) – Würzburg – Augsburg – Munich – Innsbruck) Some ICs switched between lines 4 and 5, 2 and 5 (Essen or Wuppertal), or 2 and 3 (Basel or Stuttgart).

Reunification and growth

The network continued to evolve throughout the 1980s, and in the early 1990s it saw major changes. One major driving force for this was German reunification, which saw the network expand across the former East Germany, but also the opening of two high-speed lines in 1991: Mannheim to Stuttgart and Hannover to Würzburg. The first generation ICEs were introduced around this time, and took over most services on the Hannover – Fulda corridor, while the remaining services expanded in all directions.

The routes on 2 June 1991 were as follows: