The –Pomary–Urengoy–Pomary–Uzhhorod pipeline (also known as the Bratstvo pipeline, Brotherhood pipeline, West-Siberian Pipeline, or Trans-Siberian Pipeline) is one of Russia's main natural gas export pipelines, partially owned and operated by Ukraine. It was part of the "gas in exchange for pipes program" and the Soviet-controlled bank "Ost-West Handelsbank" was opened in Frankfurt on 1 March 1973 to support the project.

History

The pipeline project was proposed in 1978 as an export pipeline from Yamburg gas field, but was later changed to the pipeline from Urengoy field, which was already in use. In July 1981, a consortium of German banks, led by Deutsche Bank, and the AKA Ausfuhrkredit GmbH agreed to provide 3.4 billion Deutsche Mark in credits for the compressor stations. Later finance agreements were negotiated with a group of French banks and the Japan Export-Import Bank (JEXIM). In 1981-1982, contracts were signed with compressors and pipes suppliers Creusot-Loire, John Brown Engineering, Nuovo Pignone, AEG-Telefunken, Mannesmann, Dresser Industries, and Japan Steel Works. Pipe-layers were bought from Komatsu.

Urengoy–Pomary–Uzhhorod pipeline

The pipeline was constructed in 1982-1984. It complemented the transcontinental gas transportation system Western Siberia-Western Europe which existed since 1973. The official inauguration ceremony took place in France.

Urengoy–Pomary–Uzhhorod pipeline

On 19 July 2011, UkrTransGaz started modernization of the pipeline.

Urengoy–Pomary–Uzhhorod pipeline

Route

The pipeline runs from Siberia's Urengoy gas field through compressor plants in Pomar, Mari El to Uzhhorod in Western Ukraine. From there, the natural gas is transported to Central and Western European countries. Together with Soyuz and Progres pipelines it forms the western transit corridor in Ukraine. It crosses the Russian–Ukrainian border north of Sumy. In Ukraine, it takes gas to the Uzhhorod pumping station on the Ukrainian border with Slovakia and to smaller pumping stations on the Hungarian and Romanian borders. The pipeline crossed the Ural, the Carpathian mountains and more than 600 rivers including Ob, Volga, Don and Dnieper rivers.

Technical features

The pipeline is long, of which is in Ukraine. Its diameter is . The original annual capacity of the pipeline was of natural gas per year. By 2009, the factual annual capacity was . It has 42 compressor stations, of which nine are in Ukraine.

The telecommunications and cathodic protection systems of the pipeline were installed by Alcatel of France. The pipeline utilizes 85 dual CCTV stations for telecommunications.

Operators

The Russian section of this pipeline is operated by Gazprom and the Ukrainian section is operated by UkrTransGaz. On 1 June 2022, 41.2 million cubic meters were transmitted through Ukraine.

Controversies

Disagreement among the allies

Soviet plans to build the pipeline were strongly opposed by the US-administration of Ronald Reagan. Americans were afraid that Western Europe would become dependent on the Soviet gas supplies, giving leverage to the Soviet Union. They also feared the Kremlin would use the export revenue for military purposes. In December 1981, the US implemented sanctions preventing American companies from exporting oil and gas technologies to the Soviet Union. In June 1982, these sanctions were expanded to cover subsidiaries of US companies in Europe.

Washington's Western European allies, however, refused to boycott the pipeline. The foreign ministers of the European Economic Community called extension of the American sanctions illegal and sent a formal note of protest. From the European perspective, participation in the pipeline project was seen as an opportunity for the depressed steel and engineering industry in Europe and as a way to diversify from the OPEC oil supplies. Western European governments insisted that contracts already signed between the Soviets and European companies needed to be honored. This led to several European companies being sanctioned by the US. Reagan reportedly said: "Well, they can have their damned pipeline. But not with American equipment and not with American technology." The efforts by the US to prevent the construction of the pipeline, and its export embargo of supplies needed to build it (1980–84), constituted one of the most severe transatlantic crises of the Cold War.

Forced labor

The construction of the pipeline was also subject to a United States Congressional hearing investigating the use of imported Vietnamese labor from re-education camps to build the pipeline.