[Footnote E: Time and distance omitted while working through timbered stretches.]

======================================================= 8 ------------------------------------------------------- Methods and conditions. ------------------------------------------------------- Top heading and bench. Muck loaded by hand.

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 — Part 17

Double heading and bench. Muck loaded by steam shovel. Stretches aggregating 200 ft. narrowed to about 25 ft. and later enlarged are included.

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 — Part 17

Excavation about 30 ft. wide. Top full-width heading and bench. Muck loaded by hand. Steam shovel not installed.

Transactions of the American Society of Civil Engineers, Vol. LXVIII, Sept. 1910 — Part 17

Excavation about 30 to 35 ft. wide. Top full-width by hand and part by steam shovel.

Double heading and bench. Part of the muck handled by hand and part by steam shovel.

Exploration drift about 10 ft. by 13 in. Muck loaded by hand. 14 ft. timbered.

At portal of twin tunnels. Drift excavated to full width and bench. Muck loaded by hand. 12 ft. timbered.

Drift excavated to full width and bench. Muck loaded by steam shovel. Full-width tunnel timbered for 26 ft. independently of the main excavation. =======================================================

When it became evident that the work through the Fifth Avenue section would be extremely slow, shafts were sunk in each street between Sixth and Seventh Avenues. The shafts, as shown on Plate XIV, were located in the streets, but in such a way as to block only half of the roadway. At the same time it was decided to construct in open cut about 200 ft. of the Three-Track Tunnel at the west end of the contract in 32d Street, where the rock surface was below the top of the tunnel. It was hoped that the remainder of the work could be built without opening the street, but further investigation showed that this was impracticable, and eventually all the Three-Track Tunnel in 32d Street, except 120 ft. east of the shaft, was built in open cut.

_Thirty-second Street Work in Tunnel._--Following the sinking of the shaft, a drift was driven across the street at the crown of the tunnel, and a top heading on the south side was excavated in both directions. Frequent cross-drifts to the north side showed that the rock was nowhere very sound and that, except for a short distance east of the shaft, it was distinctly unfavorable for the wide Three-Track excavation. In this stretch the north ends of these cross-cuts were connected by a second heading, and wall-plates and sets of three-segment arch timbering were set up to support the roof of the drifts. The cross-cuttings were gradually widened and timbered until the entire excavation had been made down to the level of the wall-plates, as shown in Fig. 3, Plate LX. The bench was then excavated in two lifts, leaving the wall-plates supported on narrow longitudinal berms, which were removed in short sections to permit the placing of posts under the wall-plates.