Redhill railway station serves the town of Redhill, Surrey, England. The station is a major interchange point on the Brighton Main Line, measured from . It is managed by Southern, and is also served by Thameslink and GWR.

History

The local topography determined that it was cheaper to build and operate a railway line between London and Brighton which by-passed the parliamentary borough and long-established market town of Reigate and instead passed through the nearby Redstone or Red Hill gap in the Reigate Foreign (countryside) parish. According to the Acts of Parliament establishing railways between London and Brighton, and London and Dover, the line was to be shared between Croydon and Red Hill after which these two would deviate. The London and Brighton Railway (L&BR) constructed the new line during 1840 and 1841, with the South Eastern Railway (SER) contributing half of the construction cost and taking ownership of the section between Croydon and Red Hill. (The SER had however been running services over the line since 1842.) The inevitable and continuing conflict between the two railway companies over the use of this joint line gave rise to the construction of four railway stations at the site of what was then a hamlet on the eastern side of Reigate.

Redhill railway station

Red Hill and Reigate Road (London & Brighton Railway) station

The original station was opened by the London and Brighton Railway on 12 July 1841 on a site to the south of the proposed junction with the South Eastern Main Line to Dover. The nearby market town was served by a horse-drawn omnibus service operated by the railway. This station was designed by the architect David Mocatta, and was one of a series of standardised modular buildings used by the railway. It closed on 15 April 1844, when the LBR began to share the SER Redhill and Reigate station and was demolished soon afterwards.

Redhill railway station

Redhill/Reigate (SER) stations

On 26 May 1842 the SER opened what was originally called 'Redhill', but later misleadingly renamed 'Reigate' station, on their own stretch of line just beyond the junction. Passengers transferring between the two railways did so at the old Merstham station further up the line. The SER wanted to replace their 'Reigate' station with a joint station immediately before the junction, but the L&BR opposed the plan. As a result, the SER forced the issue by ending the arrangements at Merstham, thereby forcing passengers to transfer between the two stations at Redhill by foot.

Redhill railway station

Redhill and Reigate station

On 15 April 1844 the SER built a new station at the present site, named 'Redhill and Reigate' which was to be used by both railways as the interchange station. On the same day the two existing stations were closed. The branch line to Reigate was opened in 1849 with a new station called Reigate Town. Nevertheless, the London Brighton and South Coast Railway (the successor of the L&BR) continued to operate the omnibus service for its own passengers.

Redhill Junction station

The SER 'Redhill and Reigate' station was rebuilt and enlarged on the same site in August 1858 when it was renamed 'Redhill Junction'. The chronic congestion at the station was however eased after 1 May 1868 when Redhill ceased to be on the South Eastern Main Line to Dover following the opening of the 'Sevenoaks cut off' line between St Johns and Tonbridge railway station. A ten-year agreement between the SER and the London Brighton and South Coast Railway (LBSCR the successor to the L&BR after July 1846) over the use of the station and lines to Coulsdon was signed 1 February 1869 and renewed ten years later.

During the 1880s, as traffic increased, the disputes over the use of line and Redhill station re-occurred. This became known as the 'Southern Lines Controversy' and ultimately led to the construction of the Quarry Line by the LB&SCR in 1899, which avoided Redhill. The LB&SCR diverted many of its Brighton Main Line trains to the new line, but retained running powers over the original line and the use of Redhill station. These were continued until both the SER and the LBSCR came under the ownership of the Southern Railway 1 January 1923 and the name of the joint station was changed to Redhill in July 1929.

Electrification

The Brighton Main Line and the line from Redhill to Reigate were both electrified under the Southern Railway on 1 January 1933. The Redhill to Tonbridge Line was electrified under British Rail in 1993.