The Scotland Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail in March 2007, the third RUS to be published. The railways in Scotland are divided into three strategic routes, namely Route 24 (East of Scotland), Route 25 (Highlands) and Route 26 (Strathclyde and South West Scotland) together with parts of Route 8 (East Coast Main Line, ECML) and Route 18 (West Coast Main Line, WCML). The three strategic routes form the scope of Network Rail's Scotland Route Utilisation Strategy. Separate RUSs for the ECML (published February 2008) and WCML (scheduled for publication late in 2009) encompass the relevant parts of routes 8 and 18. The Edinburgh Crossrail service, which provides a direct route between Stirling, Dunblane and Bathgate in the west to Newcraighall in the east, operates over part of the ECML east of Edinburgh Waverley to Portobello Junction.
The recommendations are grouped into each strategic route, and, as has become customary with RUSs, provide short-term (to end of CP3, March 2009), medium-term (CP4, 2014) and some long-term (thereafter) solutions. Essentially there are few major recommendations for the lightly used Route 25, but there are various and diverse recommendation for the other two, heavily used, routes. There are urgent issues to do with overcrowding in the peaks and with the capacity of individual lines and station, especially in the light of significant predicted growth in traffic (passenger and also freight).
Scotland, with its devolved government and Parliament responsible for transport in the nation, has been very active in pursuing the possible development of the rail infrastructure. At the time of the study and its publication there were a number of contingent projects at various stages, but mostly with capital funding already identified. These include: remodelling the western approach to Edinburgh Waverley station, and new platforms (subsequently completed February 2008 ) reopening the Stirling-Alloa-Kincardine line (subsequently completed May 2008 ) Stirling remodelling reopening the Airdrie–Bathgate rail link through route, including reinstating the Drumgelloch to Bathgate section a new Glasgow Airport Rail Link (GARL) branching off an enhanced line through Paisley the Borders Railway, a plan to reopen extensive sections of track south-east of Edinburgh the Edinburgh Airport link, a short new section of track branching off the Edinburgh to Glasgow line, with other connections
Specific measures recommended
Route 24 - East of Scotland
Short term
lengthening of some trains in the Stirling-Glasgow corridor to 6-car, with appropriate platform extensions partial remodelling and resignalling in the Stirling-Larbert corridor, partially consequent on the reopening to Alloa/Kincardine timetabling recast between Edinburgh and Aberdeen via Fife to deliver faster trains and services more responsive to demand a new fuelling and cleaning depot, probably at Perth initiatives compatible with future tram/train interchange at Edinburgh Haymarket station changes to the Edinburgh Crossrail service pattern (subsequently implemented) improvement of car parking provision in Central Scotland stations.
Medium term
significant further redevelopment at Haymarket station
further work on revamping of services on the Cowlairs junction-Glasgow Queen Street route, possibly including light rail technology signalling revamping to produce greater capacity between Haymarket and Inverkeithing, and over the Tay bridge between Aberdeen and Dundee an additional southbound freight loop at Laurencekirk remodelling of Portobello junction, east of Waverley station, between the ECML and the future Waverley Rail Link introduction of improved sustainable intermodal interchange at various places, but including provision for car parking.
Long term
there are aspirations for increased capacity and speed of service between Glasgow and Edinburgh; various possibilities need to be researched, including wholesale redevelopment of Glasgow Queen Street station
Route 25 - Highlands
Short term
some timetabling options.
Medium term
additional infrastructure to speed up and improve services Inverness-Perth and Inverness-Aberdeen lengthening of some trains to 6-car between Inverness and Aberdeen, with appropriate platform extensions.
Long term
further acceleration and increased capacity using enhanced rolling stock and (radio) signalling