The Maybole and Girvan Junction Railway was a railway company that constructed a line between Maybole and Girvan. Although promoted independently, it was supported by the Glasgow and South Western Railway, and was seen as part of a trunk line connecting Glasgow with a ferry port for the north of Ireland.
Its route remains open at the present day, carrying a moderate passenger train service between Ayr and Girvan, with some trains running from Glasgow to Stranraer.
History
Portpatrick had long been a port for shipping between Scotland and Donaghadee in the north of Ireland, since at least 1620. When railways were being developed in the south-west of Scotland it was considered essential to connect Portpatrick with the main line system, but the difficult and sparsely populated terrain made that a difficult proposition.
A line was completed in 1840 between Glasgow and Ayr, by the Glasgow, Paisley, Kilmarnock and Ayr Railway, and the Glasgow, Dumfries and Carlisle Railway connected Carlisle and Dumfries in 1848. Those two companies merged in 1850 to form the Glasgow and South Western Railway (G&SWR), which became the dominant railway company in the south west of Scotland. However Ayr and Dumfries were a considerable distance from Portpatrick.
In 1845 a scheme named the Glasgow and Belfast Union Railway (G&BUR) was formed, and obtained Parliamentary authority to build a line; this had been promoted during a period of frenzy for railway projects, but in the following year the financial bubble burst, and it became impossible to get money. The G&BUR allowed its powers to lapse without any construction taking place.
The Portpatrick Railway was the first line to connect Portpatrick: it did so in 1861, but its line led towards Carlisle (over other companies' lines) and Portpatrick was still only accessible from Glasgow by a roundabout route.
The G&SWR, by now firmly entrenched in the area but fearful of an incursion by the rival Caledonian Railway, encouraged local promoters to propose schemes, and the G&SWR supported them financially in most cases. The Ayr and Maybole Junction Railway opened in 1856, so that Maybole was now connected to Glasgow directly.
The Maybole and Girvan Railway authorised
During the construction of the Ayr and Maybole Junction line, a "Committee of Noblemen and Gentlemen" led by Sir James Fergusson of Kilkerran decided to form a company for the purpose of building a railway from Maybole to Girvan, and improving the jetty and harbour there. The cost of the scheme was estimated at £62,000. The G&SWR was supportive, and a working arrangement was finalised whereby the G&SWR would work the line for 42½% of gross receipts. The G&SWR agreed to subscribe £12,000 and when the cost estimate rose of £70,000 later in the year, the G&SWR contribution rose to £20,000. The G&SWR shareholders were not unanimously in favour of this kind of cash support, and the Chairman had to declare that, "It must be apparent to the shareholders that in going to Girvan the directors were pointing Lochryan".
It got its authorising Act of Parliament without difficulty on 14 July 1856; the capital was £68,000 and the line was to be in length.
Construction, and opening
The construction, undertaken by William Aiton and his company, process was very slow, and extra cash to the extent of £34,000 was needed by the company; the G&SWR provided £11,000. The cost of land acquisition had been £8,000 above the estimated cost, and £7,000 was expended on bridges where level crossings had originally been planned. The extra money needed was created by persuading the main contractor, William Aiton, to take 200 shares in payment, and by raising £34,000 in preference shares.
The main line finally opened for traffic on 24 May 1860, although the harbour branch, an extension beyond the passenger terminus, a second bridge over the Water of Girvan, and the jetty were not ready at this stage. Notwithstanding the apparent desire to reach Portpatrick, the station was not laid out to enable onward running southwards.
Poor financial performance
On 8 March 1861 the shareholders heard the first half-yearly report. The surplus on trading for the half year had been a disappointing £1,176; this was only enough to pay a dividend on the preference shares; in fact the company never paid a dividend to ordinary shareholders. By 1862 it was evident that this sluggish performance was to be the norm. Indeed, the company had run out of cash with work still to be done to complete the line. The G&SWR was asked to finance the work, which it did, deducting the advance from the surplus on operations.