On June 29, 1995, the Sampoong Department Store in Seoul, South Korea, collapsed due to a structural failure. The collapse killed 502 people and injured 937, making it the largest peacetime disaster in South Korean history. It was the deadliest non-deliberate modern building collapse until the 2013 Rana Plaza factory collapse in Bangladesh.

Construction on the store began in 1987 and was completed in 1990. The company initially contracted to build the structure withdrew after the chairman of Sampoong Group's construction division, Lee Joon, demanded changes to the concrete support columns that introduced structural concerns. Lee Joon ultimately used his own company to complete construction. Investigators blamed the collapse primarily on the column specifications which were incorrect for a flat-slab building design.

Sampoong Department Store collapse

On December 27, 1995, Lee Joon was convicted of criminal negligence and sentenced to 10 years and 6 months imprisonment and his son Lee Han-sang was convicted of corruption and accidental homicide and sentenced to 7 years imprisonment. On appeal Lee Joon's sentence was reduced to 7 years and 6 months imprisonment. As well, two city planners from the Seocho District of Seoul were convicted of taking bribes.

Sampoong Department Store collapse

Background

In the events leading up to the 1988 Summer Olympics, there was a large development boom in the Seoul Capital Area. Because of bans against international construction contractors signing contracts for projects in Seoul at the time, almost all buildings were being erected by South Korean companies, which typically built the structures quickly because of the large number of projects assigned to them.

Sampoong Department Store collapse

The Sampoong Group began construction of the Sampoong Department Store in 1987 over a tract of land in the Seocho District previously used as a landfill. The building's plans originally called for a residential apartment building with four floors to be built by Woosung Construction. However, during construction, the blueprints were changed by the future chairman of Sampoong Group's construction division, Lee Joon, to instead create a large department store. This involved cutting away a number of support columns to install escalators and the addition of a fifth floor (originally meant as a roller skating rink but later changed to a food court).

Woosung refused to carry out these changes due to serious structural concerns. In response, Lee Joon fired them and used his own company to complete the store's construction instead. The building was completed in late 1989, and the department store opened to the public on July 7, 1990, attracting an estimated 40,000 people per day during the building's five years of existence. The store consisted of north and south wings connected by an atrium.

The completed building was a flat-slab structure without crossbeams or a steel skeleton, which effectively meant that there was no way to transfer the load across the floors. To maximise the floor space, Lee Joon ordered the floor columns to be reduced to be thick, instead of the minimum of in the original blueprint that was required for the building to stand safely, and the columns were spaced apart to maximize retail space, a decision that meant that there was more load on each column than there would have been if the columns had been closer together. The fifth-story restaurant floor had a heated concrete base referred to as ondol, which has hot water pipes going through it; the presence of the ondol greatly increased the weight and thickness of the slab. Further to this, the store's three 15-tonne air conditioning units were installed on the roof leading to a greater structural strain. The air conditioning was also exceedingly loud and led to noise complaints by customers.

In 1993, the air conditioning units were dragged across the overloaded roof, resulting in cracking. The units were moved over column 5E, where the most visible cracks in the fifth floor were seen before the collapse. The cracks in the columns worsened because the columns supporting the fifth floor were not aligned with the ones supporting lower floors, thus causing the load of the fifth floor to be transferred through the slab.

Timeline of events

Collapse

In April 1995, cracks began to appear in the ceiling of the fifth floor in the south wing, with the only response by Lee Joon and his management staff to move merchandise and stores from the top floor to the basement.