New Cross Gate is a railway station in New Cross, London, on the Brighton Main Line and the London Overground. It is down the line from and is about west of station. It is in Travelcard Zone 2, and is operated by London Overground.

History

England's railway boom of the 1830s led to two competing companies driving lines through the area. The first, the London and Croydon Railway (L&CR), established a station on New Cross Road close to Hatcham in 1839. The second, the South Eastern Railway (SER), established a station near Amersham Way in the heart of New Cross in 1849. After both stations came under the ownership of the Southern Railway on 1 January 1923 the former L&CR station was renamed New Cross Gate on 9 July 1923.

New Cross Gate railway station

During the 19th century, New Cross (Gate) became an important junction where the South London Line, the East London Line, and the Bricklayers Arms Line diverged from the Brighton Main Line to .

New Cross Gate railway station

London and Croydon Railway Station

The original station was officially opened on 1 June 1839 by the London and Croydon Railway. and became fully operational on 5 June 1839. It was intended to become the main freight depot and locomotive workshop for the company. In July 1841 the line (but not the station) was also used by the London and Brighton Railway. The London and Croydon and London and Brighton companies merged to form the London, Brighton and South Coast Railway (LB&SCR) in July 1846. Between February and May 1847 the station at New Cross was the northern terminus of the atmospheric propulsion system introduced by the L&CR, but in the latter month the system was abandoned by the new company.

New Cross Gate railway station

London Brighton and South Coast Railway Station

On 1 October 1847 the newly formed LB&SCR closed the existing New Cross station, replacing it with another at Cold Blow Lane 0.25 miles to the north, in an attempt to secure passengers from the planned North Kent Line of the SER. This move was not a success and was subject to much local criticism, so on 1 May 1849 the LB&SCR rebuilt and re-opened New Cross on the original site.

The current station therefore dates from 1849 but was again rebuilt in 1858 to allow for the quadrupling of the Brighton Main Line. Further rebuilding was undertaken in 1869 when the East London Railway opened a line to Whitechapel and .

The line through the station was electrified in 1928 by the Southern Railway using the third rail system, although the majority of services continued to be steam hauled until the electrification of the Brighton main line in 1932.

East London Railway Station

On 7 December 1869 a separate station for East London Railway services was opened adjacent to the London, Brighton & South Coast Railway station. It was closed on 1 September 1886 when services were diverted to the LB&SCR station. Soon after closure the station was demolished and the land used for sidings.

East London Railway

The East London Railway (ELR) was owned by a consortium of railway companies. Passenger services were operated by the LB&SCR between Croydon and Liverpool Street, and from 1884 by the District Railway between New Cross (Gate) and Shoreditch. LB&SCR services ceased on 31 March 1913, when the line was electrified using the fourth rail system and thereafter all passenger services were operated by the Metropolitan Railway. For the opening of the ELR a separate ELR station was built in 1869 adjacent to the LB&SCR station. It was closed in 1876 and the trains were diverted to the adjacent LB&SCR station. It was reopened in 1884 for additional Metropolitan District Railway services only for it to close two years later. The ELR station was then demolished around 1900 and the site used for sidings.

In 1933 the Metropolitan railway was taken over by the London Passenger Transport Board, which operated services as part of the London Transport Metropolitan line. London Transport was superseded by Transport for London (TfL).

Freight yard

The London and Croydon planned to use New Cross as the London terminal for its freight traffic, as the station had good access to the Grand Surrey Canal. It therefore built extensive sidings for this purpose. After 1849 the principal freight-handling facility in the area was moved to Willow Walk on the Bricklayers Arms site, but the sidings continued to be used for the storage of carriages. An Ordnance Survey map for 1871 shows a substantial carriage shed on the west side of the main line, north of the station, but this was no longer shown on the 1894 map. It had been replaced by a combined carriage and locomotive shed on the east side of the line in 1894, but this closed in 1906.