Blasting, cutting and levelling, building a track to carry heavy trains through mountain passes and along the sides of precipices where even a mountain goat never ventured before, demanded the highest degree of skill, endurance, and dogged defiance of danger. Towering heights and raging torrents, hard rock and dense forest, crumbling gravel and avalanching snow, all were encountered and all were overcome.

Besides the mountains and chasms of the Far West, there was the long mountainous stretch north of Lake Superior, where the thrilling grandeur of the scenery may suggest to the admiring passenger some feeble idea of the tremendous toil which alone made possible his enjoyment or indeed his very sight of it. Here 200 miles of railway track cost $12,000,000, of which $2,100,000 was used for dynamite alone. A dynamite factory had to be established on the spot. The bridges, tunnels and galleries along the face of the cliff for three miles at Jackfish Bay cost $1,500,000. A single mile cost $700,000.

The Book of the West — Part 79

There was only one town of any size in the whole length of the line, from eastern Ontario to the British Columbian shore; and Winnipeg itself had not 8,000 inhabitants when the work began in 1881. Practically every company and battalion of the great army of railway builders was hundreds of miles from its base of supplies. The fighting line, far longer than all the battle lines on the French, Italian and Russian war fronts put together, stretched for over 2,500 miles through an almost uninhabited and untilled wilderness.

The Book of the West — Part 79

With such tremendous energy and enthusiasm was the work pushed on, that in less than half the promised time it was finished. The discovery of a useless North West Passage had taken centuries; the creation of an infinitely useful North West Passage overland had taken only five years. The first sod had been turned on May 2, 1881; the prairie section reached Calgary on August 18, 1883; the last gap north of Lake Superior was closed on May 17, 1885, giving a continuous line of steel from Montreal to the Rocky Mountains; and on the 7th of November in the same year the last spike was driven at Craigellachie, 85 miles west of the Selkirk summit in British Columbia. The first through passenger train, from the head of Atlantic navigation on the St. Lawrence to the head of Pacific navigation on Burrard Inlet, left Montreal on the evening of June 28, 1886, and finished its memorable journey at Port Moody on the morning of July 4. The great city of Vancouver, twelve miles down the Inlet, was then but a clearing in the forest scarcely three months old. It took Port Moody’s place as the Pacific terminus in June, 1887.

The Book of the West — Part 79