South Point Hotel, Casino & Spa (formerly South Coast) is a resort located along Las Vegas Boulevard in Enterprise, Nevada, south of the Las Vegas Strip. It is owned and operated by Michael Gaughan, the founder of Coast Casinos. It includes a casino and a 25-story hotel with 2,163 rooms.
Coast Casinos purchased the site in 2001, and announced the South Coast project in April 2003. Construction began one year later. Coast Casinos was subsequently merged with Boyd Gaming. The South Coast was built at a cost of $625 million. It opened on December 22, 2005, and included an casino and 652 rooms. A second hotel tower opened the following year.
The resort struggled early on, and Gaughan took over ownership from Boyd in October 2006, renaming it the South Point. A third tower was opened in 2008, and further expansion took place in 2010, adding new restaurants and additional casino space. The resort has an equestrian and events center, and was the namesake for Gaughan's NASCAR team, South Point Racing. It is also the sponsor of the South Point 400 stock car race.
History
In November 2001, Coast Resorts (later Coast Casinos) announced that it had acquired a 50-acre parcel in the southern Las Vegas Valley. The site is located several miles south of the Las Vegas Strip, at the southwest corner of Las Vegas Boulevard and Silverado Ranch Boulevard. Interstate 15 runs alongside the property's western edge. Coast planned to begin construction of a locals casino on the property within three years, once housing development picked up in the area.
South Coast (2005–06)
In April 2003, Coast Casinos announced that it would build the South Coast resort on the property, with the opening expected two years later. It would be similar to the company's Suncoast Hotel and Casino. It would be built in the fastest-growing area of the Las Vegas Valley, and would be the first major resort in the area, which included the small Silverton hotel-casino. It would compete against the Green Valley Ranch hotel-casino, located approximately five miles east.
Coast Casinos owner Michael Gaughan initially said that the resort would target a younger clientele and focus primarily on the locals market. Early in the design phase, a total of 750 rooms were planned. Gaughan subsequently added three 245-foot hotel towers to his plans for a total of 2,139 rooms, stating that he viewed the project as an extension of the Strip rather than a neighborhood casino. The hotel floorplan would be built out with the towers forming a "T" shape when viewed overhead. Gaughan also sought to add a showroom space capable of converting into a nightclub.
Groundbreaking took place on April 22, 2004. Three months later, Coast Casinos merged with Boyd Gaming, becoming a subsidiary of the latter. Gaughan remained involved with the South Coast project. J.A. Tiberti Construction served as general contractor. The resort was designed by Leo A Daly and Klai Juba Architects. The project was viewed as a larger version of the Suncoast, and it had a similar layout. Gaughan's son, vice president and general manager Michael Gaughan Jr., described the property as "the Suncoast on steroids". During construction, the surrounding area became popular for condominium and timeshare projects, including the adjacent Grandview at Las Vegas.
Boyd announced in May 2005 that it would soon begin construction on the second tower. The decision came sooner than expected, a result of strong economic conditions. The second phase increased the project's cost by $100 million, bringing the total to $600 million. Gaughan had originally planned to spend around $350 million on the project. An increase in the cost of building supplies and labor contributed to the rising total.
The South Coast opened on the night of December 22, 2005. The opening featured a fireworks show which sparked a small rooftop fire, although it had no impact on the opening. At the time, the South Coast was the first Las Vegas resort to be seen by motorists arriving from southern California on I-15. It also served nearby communities, such as Southern Highlands and Anthem, which lacked a casino resort. The property employed around 2,400 people. The second tower was scheduled to open approximately four months after the resort's initial opening.
The ultimate cost of the resort was $625 million. Early revenue was less than expected, in part because certain amenities had yet to be finished, including a spa and nightclub. Nearby road construction, as well as an unfinished nearby exit from I-15, also hampered the resort.