Las Vegas is the planned northern terminus of the Brightline West high-speed rail service. The is on the south Las Vegas Strip in Enterprise. The two-story station will feature retail and restaurant space, areas for connecting transportation, as well as a 2,400-space seven-story parking garage. Construction permits were acquired in March 2020 by Brightline, construction is expected to begin in 2024 with rail operations beginning in 2027. Located on the west side of Las Vegas Boulevard between Blue Diamond Road and Warm Springs Road, the site they acquired, across from the Premium Outlets South mall, has plenty of room for additional transit-oriented development. On March 30, 2022, Oak View announced a 20,000-seat arena in Las Vegas on an adjacent south of the station.

Early proposals

The 2011 project outline had several options in Las Vegas near the Rio All-Suite Hotel and Casino or Downtown. One potential Las Vegas station location was approved as the site of Allegiant Stadium.

Las Vegas station (Brightline West)

References

Brightline stations

Railway stations scheduled to open in 2027

Transportation in the Las Vegas Valley

Buildings and structures in Enterprise, Nevada

Proposed railway stations in the United States

Las Vegas station (Brightline West)