The Extremely Large Telescope (ELT) is an astronomical observatory under construction. When completed, it will be the world's largest optical/near-infrared extremely large telescope. Part of the European Southern Observatory (ESO) agency, it is located on top of Cerro Armazones in the Atacama Desert of northern Chile.

The design consists of a reflecting telescope with a segmented primary mirror and a diameter secondary mirror. The telescope will be supported by adaptive optics, six laser guide star units, and multiple large science instruments. The observatory's design will gather 100 million times more light than the human eye, equivalent to about 10 times more light than the largest optical telescopes existing as of 2023, and will correct for atmospheric distortion. It has around 250 times the light gathering area of the Hubble Space Telescope and, according to the ELT's specifications, would provide images 16 times sharper than those from Hubble.

Extremely Large Telescope

The project was originally called the European Extremely Large Telescope (E-ELT), but the name was shortened in 2017. The ELT is intended to advance astrophysical knowledge by enabling detailed studies of planets around other stars, the first galaxies in the Universe, supermassive black holes, and the nature of the Universe's dark sector, and to detect water and organic molecules in protoplanetary disks around other stars. As planned in 2011, the facility was expected to take 11 years to construct, from 2014 to 2025.

Extremely Large Telescope

On 11 June 2012, the ESO Council approved the ELT programme's plans to begin civil works at the telescope site, with the construction of the telescope itself pending final agreement with governments of some member states. Construction work on the ELT site started in June 2014. By December 2014, ESO had secured over 90% of the total funding and authorized construction of the telescope to start, which will cost around one billion euros for the first construction phase. The first stone of the telescope was ceremonially laid on 26 May 2017, initiating the construction of the dome's main structure and telescope. The telescope passed the halfway point in its development and construction in July 2023, with completion and first light planned for 2028.

Extremely Large Telescope

History

On 26 April 2010, the European Southern Observatory (ESO) Council selected Cerro Armazones, Chile, as the baseline site for the planned ELT. Other sites that were under discussion included Cerro Macon, Salta, in Argentina; Roque de los Muchachos Observatory, on the Canary Islands; and sites in North Africa, Morocco, and Antarctica.

Early designs included a segmented primary mirror with a diameter of and an area of about , with a secondary mirror with a diameter of . However, in 2011 a proposal was put forward to reduce overall size by 13% to 978 m2, with a diameter primary mirror and a diameter secondary mirror. This reduced projected costs from 1.275 billion to 1.055 billion euros and should allow the telescope to be finished sooner. The smaller secondary is a particularly important change; places it within the capabilities of multiple manufacturers, and the lighter mirror unit avoids the need for high-strength materials in the secondary mirror support spider.

ESO's Director General commented in a 2011 press release that "With the new E-ELT design we can still satisfy the bold science goals and also ensure that the construction can be completed in only 10–11 years." The ESO Council endorsed the revised baseline design in June 2011 and expected a construction proposal for approval in December 2011. Funding was subsequently included in the 2012 budget for initial work to begin in early 2012. The project received preliminary approval in June 2012. ESO approved the start of construction in December 2014, with over 90% funding of the nominal budget secured.

The design phase of the 5-mirror anastigmat was fully funded within the ESO budget. With the 2011 changes in the baseline design (such as a reduction in the size of the primary mirror from 42 m to 39.3 m), in 2017 the construction cost was estimated to be €1.15 billion (including first generation instruments). In 2014, the start of operations was planned for 2024. Actual construction officially began in early 2017, and , first light is planned for 2028.